Back to Best Solar Software
Best ListBest-Of List6 tools compared

AI Solar Design Tools (2026): Six Tools Compared

Six solar design tools compared on how each vendor describes its AI features, price and trial access. SurgePV publishes this page and is one of the six. Checked October 2026.

SurgePV publishes this list and sells solar design and proposal software, so we have a commercial interest in this category. This is a desk comparison of what each vendor publishes; we have not run side-by-side tests. Prices and vendor facts checked October 2026. How we evaluate software

Published Last updated
Keyur Rakholiya

Written by

Keyur Rakholiya

CEO & Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Pick by what the AI is meant to do. Aurora Solar says Aurora AI generates a roof model and code-compliant panel layout. OpenSolar calls its Auto Design AI-powered, and labels it beta. EasySolar describes a virtual engineer that you instruct in plain language. RatedPower describes AI-powered design for utility-scale PV and storage. PVcase describes smart algorithms for layout. SurgePV lists AI solar designing and Clara AI, an AI copilot, priced per user.

This is a desk comparison of what each vendor says on its own pages, checked October 2026. We have not run side-by-side tests, and we make no claim about how accurate any tool’s AI is. SurgePV publishes this page and is one of the six tools on it. Two tools named in an earlier version of this page are not compared here: SolarAI by Sungage and SolarMyHome. We found no vendor page for either that we could read. Enphase Solargraf is not compared here either. Its site returned HTTP 403 to automated reads in October 2026. See the global list of solar design software for other tools.

Criteria used: what the vendor says the AI does, price, and free or trial access.

Want to see SurgePV on your own project?

Book a guided demo and bring a real site. We walk through design, yield, finance and the proposal in one platform.

Book a Free Demo

Checking cost first? See the SurgePV pricing page.

Best-For Picks for AI Design

  • AI-generated roof model and layout on a per-user plan: Aurora Solar. Its home page says Aurora AI and other automations generate a roof model and code-compliant panel layout in minutes. Basic is $159 per user per month.
  • A free core app with AI-powered Auto Design: OpenSolar. Its Auto Design page says it is in beta and creates rendered 3D designs. The core app is free. API Access and connectors are charged from 16 April 2026.
  • Plain-language instructions to a virtual engineer: EasySolar. Its home page lists a 3-day trial. A card is required.
  • Utility-scale PV and storage design with an AI layer: RatedPower. Its home page describes Enverus ONE Power Analyst as an AI engineering teammate. It lists no price.
  • Layout automation inside AutoCAD: PVcase. Its Roof Mount page describes algorithms that automate mechanical layouts and electrical calculations.
  • Roof model to proposal in one product with an AI copilot, priced per user: SurgePV. Its pricing page lists AI-powered 3D roof modeling and panel placement, and Clara AI.

Comparison Table

Listed alphabetically. This is not a ranking; pick by the situation above. Prices checked October 2026 on each vendor’s own page.

Tool Best for Price Free or paid What the vendor says about AI
Aurora Solar AI roof model and layout Basic $159 per user per month; $135 billed annually Paid Aurora AI generates a roof model and code-compliant layout
EasySolar Plain-language virtual engineer Price list not read 3-day trial, card required “The language model never generates a number”
OpenSolar Free core app with Auto Design Core app free; API Access and connectors charged from 16 April 2026 Free core app, paid API and connectors AI-powered Auto Design, in beta
PVcase AutoCAD layout automation Not published Paid, demo Smart algorithms; AI not named on the Roof Mount page
RatedPower Utility-scale PV and storage Not published Paid, demo or product tour AI-powered design; ONE Power Analyst AI layer
SurgePV Roof model to proposal, per user $1,899 per user per year (1 user) Paid, guided demo AI solar designing and Clara AI

Tool Entries

Aurora Solar

Best for: teams that want AI-generated roof models and layouts on a per-user plan.

Not the right choice if: you want a free plan. Aurora’s pages we read list no free tier. The page names an AI feature for lead capture, not an AI proposal feature.

What the vendor documents: the home page says “Aurora AI and other advanced automations generate a roof model and code-compliant panel layout in minutes”. It says shading analysis, stringing and fire pathways are handled automatically. A customer quote on the page refers to Lead Capture AI.

Price (checked October 2026): on the pricing page, Basic is $159 per user per month, or $135 per user per month billed annually. Premium is $259 per user per month, or $220 per user per month billed annually.

Limitations: the vendor describes the AI; we did not check its accuracy.

Vendor link: aurorasolar.com.

Aurora Solar public website page, captured 29 October 2026
Aurora Solar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

EasySolar

Best for: small teams that want to brief a virtual engineer in plain language and review its work.

Not the right choice if: you need a price before you start. The home page links to a price list that we did not read. The trial needs a card.

What the vendor documents: the home page describes a “virtual engineer” you instruct in everyday language. It covers design from a roof photo, aerial imagery or a drone or site plan, energy calculations, proposals, a client portal and electrical schematics. It says “Nothing leaves without you” and “The language model never generates a number”.

Price (checked October 2026): not read. The FAQ lists a 3-day trial with full access, and says a card is required.

Limitations: the vendor’s speed claims are its own, and we did not check them.

Vendor link: easysolar.app.

EasySolar public website page, captured 29 October 2026
EasySolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

OpenSolar

Best for: installers who want a free core app with AI-powered 3D design and proposals.

Not the right choice if: you need the AI design feature to be out of beta. Its page says Auto Design is in beta. API Access and supported connectors are charged from 16 April 2026.

What the vendor documents: the Auto Design page calls it “AI-powered auto design” and says Ada creates build-ready designs in seconds. It lists rendered 3D designs, automatic pitch, azimuth and shading, an automatic bill of materials, and feeds into the Sales Machine proposal. Admins enable it through the beta features setting.

Price (checked October 2026): the core app is free of charge for solar professionals, per the vendor. From 16 April 2026 the vendor charges for API Access and supported connectors, per its 16 February 2026 post.

Limitations: the accuracy statement on the Auto Design page is the vendor’s own.

Vendor link: opensolar.com.

OpenSolar public website page, captured 29 October 2026
OpenSolar public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

PVcase

Best for: engineering teams that design commercial rooftops inside AutoCAD and want layout automation.

Not the right choice if: you want AI features by name, a published price or a self-serve trial. The Roof Mount page describes algorithms, not AI.

What the vendor documents: the Roof Mount page says it “automates time-intensive tasks using smart algorithms for swift, accurate layout creation”. It describes shading algorithms and advanced algorithms that automate mechanical layouts and electrical calculations.

Price (checked October 2026): not published. The pricing pages point to “Talk to sales” or “Request pricing”.

Limitations: we found no AI wording on the page we read.

Vendor link: pvcase.com.

PVcase public website page, captured 29 October 2026
PVcase public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

RatedPower

Best for: utility-scale PV, storage and hybrid developers who want an AI layer on top of design and yield tools.

Not the right choice if: you design homes or small roofs, or you need a published price. The home page lists none.

What the vendor documents: the home page describes Enverus RatedPower as “AI-powered solar PV and BESS design” software. Its modules include a PV site analysis tool, a solar modeling tool, 3D energy yield estimates, BESS software, a solar CAD tool and solar proposal software. The AI layer, Enverus ONE Power Analyst, is described as an AI engineering teammate. The page says nothing is saved or executed without the user’s explicit confirmation.

Price (checked October 2026): not published. The page offers a product tour and a live demo.

Limitations: the page sets out no project size range.

Vendor link: ratedpower.com.

RatedPower public website page, captured 29 October 2026
RatedPower public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

SurgePV

SurgePV is our product.

Best for: teams that want AI-powered roof modeling, panel placement and proposals in one product, priced per user.

Not the right choice if: you want a self-serve trial (SurgePV offers a guided demo), or you design utility-scale plants. Outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility.

What the vendor documents: the pricing page lists “AI-powered 3D roof modeling & panel placement”, AI solar designing in every plan, and Clara AI, described as an AI copilot for design and workflow automation. The published scope also lists shading analysis, energy-yield modeling, financial modeling, electrical workflow support, bill-of-materials output and proposal generation. See solar design software.

Price (checked October 2026): $1,899 per user per year for 1 user, $1,499 per user for 3 seats, $1,299 per user for 5 seats, in US dollars. Enterprise is custom.

Limitations: results depend on source data, assumptions and equipment models. We did not check the accuracy of the AI.

Vendor link: surgepv.com.

SurgePV public website page, captured 29 October 2026
SurgePV public website capture, captured 29 October 2026. This shows the vendor's website, not a test inside the software.

See SurgePV on your own project

Book a guided demo and ask for the AI design outputs you need.

Book a Free Demo

How We Ordered These Tools

We did not rank these tools. They are listed alphabetically, and the best-for picks come from the vendor statements above.

  • What the vendor says the AI does: we quote the vendor and do not assess whether the AI works as described.
  • Price: each vendor uses its own currency and unit. We did not assess discounts or negotiated quotes.
  • Free or trial access: trying a tool on your own project is the best check. We did not test any trial.

Methodology and Disclosure

SurgePV is published by SurgePV, which is also one of the vendors on this list. Its entry follows the same template and sources as the others: the vendor’s own public pages, read in October 2026. Where a page does not state a feature, we leave it out.

Sources and Dates

Vendor pages were read in October 2026. Prices and features come from the vendor pages linked here and in the entries above. Each vendor page can change, so check the vendor before you buy.

Go Deeper on a Category

Frequently Asked Questions

What is AI solar design software?

It is solar design software where the vendor says AI does part of the work, such as building a roof model, placing panels or drafting a proposal. Each vendor on this page describes its own AI in its own words. We list what the vendor says and make no claim about accuracy.

Which solar design tools say they use AI?

Aurora Solar names Aurora AI, which it says generates a roof model and code-compliant panel layout. OpenSolar calls its Auto Design AI-powered and labels it beta. EasySolar describes a virtual engineer driven by plain-language requests. RatedPower describes AI-powered PV and storage design. SurgePV lists AI solar designing and Clara AI. PVcase describes smart algorithms for layout and does not use the word AI on the Roof Mount page we read.

Are AI solar design tools free?

OpenSolar says its core app is free for solar professionals. API Access and connectors are charged from 16 April 2026, and Auto Design is in beta. EasySolar lists a 3-day trial that needs a card. Aurora Solar, SurgePV and PVcase are paid, and SurgePV starts with a guided demo.

How much do AI solar design tools cost?

Aurora Basic is $159 per user per month, or $135 per user per month billed annually. SurgePV is $1,899 per user per year for one user, $1,499 per user for 3 seats and $1,299 per user for 5 seats. OpenSolar is free at the core. PVcase and RatedPower publish no price on the pages we read. EasySolar links to a price list that we did not read.

Can AI replace a solar engineer?

No vendor page we read says so. EasySolar says its virtual engineer prepares work for your review and that nothing leaves without you. SurgePV outputs support design and documentation but do not replace approval by the responsible engineer, authority, lender or utility.

About the Contributors

Author
Keyur Rakholiya
Keyur Rakholiya

CEO & Co-Founder · SurgePV

Keyur Rakholiya is identified by SurgePV as its CEO and a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; credentials, project totals, testing claims, media appearances, and speaking engagements are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Ready to Design and Propose Faster?

SurgePV covers solar design, energy-yield modeling, financial modeling, and proposals in one platform. Book a guided demo to see it on a project like yours.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.