SurgePV Academy
Six structured tracks, three certifications, and live cohort programs are coming soon. Join the waitlist to get early access to solar design, simulation, sales, and project management training from working engineers — not marketing teams.
Training Tracks
Six tracks for every solar role
Solar Design Fundamentals
12-module foundation course covering site assessment, panel layout, shading analysis, electrical design, and proposal generation. Built for new solar engineers and sales engineers.
Advanced Simulation & Bankability
Module-level yield simulation, P50/P90 analysis, TMY data selection, and producing lender-grade reports. Covers PVsyst-equivalent methodology in SurgePV.
Commercial & Utility-Scale Design
Ground-mount layout, single-axis trackers, terrain modeling, central inverter sizing, and balance-of-plant routing for projects above 1 MW.
Solar Sales Excellence
Lead qualification, 18-minute proposal workflow, financing presentation, objection handling, and close-rate optimization. Built for solar sales reps.
Electrical Design & Compliance
NEC 2023, IEC 60364, AS/NZS 3000 compliant single-line diagrams, wire sizing, conduit fill, voltage drop, AFCI/GFCI selection, and AHJ-ready documentation.
Project Management for Solar
From signed contract to PTO. Permitting workflows, interconnection applications, installation coordination, commissioning, and post-install monitoring handoff.
Certifications
Earn industry-recognized credentials
Validate your expertise with role-based certifications. Listed on your LinkedIn and recognized by SurgePV's partner network.
Certified SurgePV Designer (CSD)
Validates proficiency in residential and commercial solar design using SurgePV. Exam: 60 questions, 90 minutes. Re-certification every 24 months.
Certified SurgePV Sales Engineer (CSSE)
Validates ability to design, simulate, and present proposals to homeowners and commercial buyers. Exam: 50 questions plus live proposal demonstration.
Certified Utility-Scale Specialist (CUSS)
Validates expertise in terrain modeling, tracker design, and bankable simulation for projects above 1 MW. Exam plus capstone project required.
Join the Waitlist
Courses are coming soon. Join the waitlist to be the first to know when enrollment opens and to reserve your spot in cohort schedules, team licenses, and certification exams.
Join waitlist