Solar Installers in California

Compare published solar company information across California, verify credentials directly, and request quotes from local installers.

89 Companies12 Cities0 Reviews

All Solar Installers in California

89 solar companies across California

AP

Albion Power Company

Est. 2005·San Francisco, California·Reported 25yr warranty
SolarBatteryroofingelectrical

Reported credentials: CSLB Licensed

AB

All Bay Solar

Est. 2011·San Francisco, California·Reported 25yr warranty
SolarBatteryroofingelectrical

Reported credentials: BBB Accredited · CSLB Licensed

Canadian Solar + Enphase

AS

Alltech Solar

Est. 1995·San Diego, California·Reported 25yr warranty
SolarBatteryelectricalMaintenance

Reported credentials: BBB Accredited · CSLB Licensed

AA

American Array Solar and Roofing

Est. 2012·Los Angeles, California·Reported 25yr warranty
SolarBatteryRoof AssessmentDesign

Reported credentials: GAF Certified · Panasonic Certified · Enphase Gold

Panasonic + Enphase

AS

APG Solar

Est. 2012·Stockton, California·Reported 25yr warranty
SolarBatteryMaintenanceDesign

Reported credentials: BBB Accredited

AE

Arc Energy Solutions

Bakersfield, California·Reported 25yr warranty
SolarBatteryMaintenance

Reported credentials: CSLB #1121783 · BBB Accredited

AS

Arvo Solar

Est. 2018·Sacramento, California·Reported 25yr warranty
SolarBatteryCommercialDesign
AS

Aviara Solar Contractors

Est. 2007·San Diego, California·Reported 25yr warranty
SolarBatteryMaintenanceEnergy Audit

Reported credentials: CSLB Licensed

AS

AWS Solar

Est. 2007·Los Angeles, California·Reported 25yr warranty
SolarBatteryEV ChargingMaintenance

Reported credentials: NABCEP · BBB Accredited · Tesla Certified · Panasonic Certified

CertainTeed + Enphase

AS

Aztec Solar

Est. 1980·Rancho Cordova, California·Reported 25yr warranty
SolarBatteryMaintenancesolar_pool_heating

Reported credentials: CSLB Licensed Solar Contractor (#550110) · CSLB General Contractor (#1073764)

Silfab + SolarEdge

AS

Aztec Solar

Est. 1980·Sacramento, California·Reported 25yr warranty
SolarMaintenanceCommercialDesign

Reported credentials: NABCEP Board Member · California Solar + Storage Association · BBB Accredited

BC

Bland Company

Est. 1985·Bakersfield, California·Reported 25yr warranty
SolarBatteryMaintenanceMonitoring

Reported credentials: NABCEP Master Level · Licensed HERO Contractor · HomeAdvisor Screened & Approved

How We Rank Solar Installers

Directory ordering uses currently published profile information such as claimed status, stated experience, services, and warranty fields. Verify all company claims before hiring.

Customer Reviews

Ratings are not republished unless SurgePV can document their source and verification. Check current feedback on the original platform.

Certifications

NABCEP certification is the US gold standard. We also check for state licensing, BBB accreditation, and manufacturer certifications.

Track Record

Published profile fields help users compare companies. These details are not a quality score and must be verified directly.

Why Trust the SurgePV Directory?

Profiles compile available company information for comparison. SurgePV does not guarantee licensing, certification, active-trading status, or service quality. Verify each item directly.

89

Published Profiles

0

Customer Reviews

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Frequently Asked Questions

How much do solar panels cost in California?

Solar panel costs in California typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. State and local incentives, net metering, and SRECs may help reduce your net cost.

What certifications should I look for?

NABCEP (North American Board of Certified Energy Practitioners) certification is the gold standard. At minimum, your installer should hold the required California state contractor license, carry liability insurance and workers' compensation, and have manufacturer certifications for the equipment they install.

What solar incentives are available in California?

The 30% federal residential solar tax credit expired on December 31, 2025. Homeowners in California can no longer claim this federal credit for new installations. State-level incentives may still be available, including state tax credits, rebates, property tax exemptions, sales tax exemptions, net metering, and SRECs. Commercial projects may still qualify for the federal ITC under transition rules. Check with your installer or visit the DSIRE database for current California-specific incentives.

Are You a Solar Installer in California?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.