S

Solar Optimum in Los Angeles

Los Angeles, California·Solar Installation
ResidentialCommercial

18+ yrs

Experience

120 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solar Optimum

California's #1 residential solar contractor — award-winning solar, battery, and roofing installations since 2008

Los Angeles, California 91201

Los Angeles, California 91201

Services Offered

Solar InstallationBattery StorageRoof AssessmentEnergy AuditMonitoringSolar Design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Tesla CertifiedEnphase PlatinumGAF CertifiedQCells CertifiedCertainTeed Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

QCellsCertainTeed

Inverters

Enphase

Batteries

Tesla PowerwallEnphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Los Angeles, CaliforniaGlendale, CaliforniaPasadena, CaliforniaBurbank, CaliforniaSanta Monica, CaliforniaLong Beach, CaliforniaIrvine, CaliforniaSan Diego, CaliforniaRiverside, CaliforniaOrange County, California

Customer Reviews

No reviews yet. Be the first to review Solar Optimum!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar Optimum?

You can request a quote through the form on this page or contact Solar Optimum directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar Optimum serve?

Solar Optimum is based in Los Angeles and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar Optimum hold?

This profile lists the following reported certifications: Tesla Certified, Enphase Platinum, GAF Certified, QCells Certified, CertainTeed Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solar Optimum offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Solar Optimum for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar Optimum for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar Optimum handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar Optimum which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar Optimum

Send your project details to request follow-up from Solar Optimum. Response timing and consultation terms are set by the company.

For Solar Optimum

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar Optimum

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.