G

Green Convergence in Los Angeles

Los Angeles, California·Solar Installation
ResidentialCommercial

18+ yrs

Experience

3500+

Projects

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Green Convergence

SunPower Master Dealer in the Greater Los Angeles area with 3,500+ installations and a 50-year warranty

Los Angeles, California 91355

Los Angeles, California 91355

Services Offered

Solar InstallationBattery StorageEnergy AuditSolar DesignMonitoringRoof Assessment

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB AccreditedSunPower Master Dealer

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

MaxeonPanasonicREC

Inverters

EnphaseSolarEdge

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

50yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Los Angeles, CaliforniaValencia, CaliforniaSanta Clarita, CaliforniaPalmdale, CaliforniaLancaster, CaliforniaBurbank, CaliforniaGlendale, CaliforniaSimi Valley, CaliforniaThousand Oaks, CaliforniaVentura, California

Customer Reviews

No reviews yet. Be the first to review Green Convergence!

Write a Review

Frequently Asked Questions

How do I get a quote from Green Convergence?

You can request a quote through the form on this page or contact Green Convergence directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Green Convergence serve?

Green Convergence is based in Los Angeles and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Green Convergence hold?

This profile lists the following reported certifications: NABCEP, BBB Accredited, SunPower Master Dealer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Green Convergence offer?

This profile reports 25-year panel coverage and 50-year workmanship coverage. Ask Green Convergence for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Green Convergence for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Green Convergence handle permits and paperwork?

The exact scope is not verified on this profile. Ask Green Convergence which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Green Convergence

Send your project details to request follow-up from Green Convergence. Response timing and consultation terms are set by the company.

For Green Convergence

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

Green Convergence

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.