C

Cobalt Power Systems in San Jose

San Jose, California·Solar Installation
ResidentialCommercial

23+ yrs

Experience

4000+

Projects

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Cobalt Power Systems

SunPower Elite Dealer and Tesla Certified installer since 2003, with 4,000+ installations and 20+ years of experience

San Jose, California 94043

San Jose, California 94043

Services Offered

Solar InstallationBattery StorageSolar DesignRoof AssessmentGrid ConnectionMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

SunPower Elite DealerSunPower Commercial DealerTesla Powerwall CertifiedCSLB LicensedBBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

MaxeonSunPower

Inverters

EnphaseSolarEdge

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

San Jose, CaliforniaMountain View, CaliforniaPalo Alto, CaliforniaSunnyvale, CaliforniaSanta Clara, CaliforniaSan Francisco, CaliforniaRedwood City, CaliforniaFremont, California

Customer Reviews

No reviews yet. Be the first to review Cobalt Power Systems!

Write a Review

Frequently Asked Questions

How do I get a quote from Cobalt Power Systems?

You can request a quote through the form on this page or contact Cobalt Power Systems directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Cobalt Power Systems serve?

Cobalt Power Systems is based in San Jose and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Cobalt Power Systems hold?

This profile lists the following reported certifications: SunPower Elite Dealer, SunPower Commercial Dealer, Tesla Powerwall Certified, CSLB Licensed, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Cobalt Power Systems offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Cobalt Power Systems for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Cobalt Power Systems for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Cobalt Power Systems handle permits and paperwork?

The exact scope is not verified on this profile. Ask Cobalt Power Systems which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2003
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Cobalt Power Systems

Send your project details to request follow-up from Cobalt Power Systems. Response timing and consultation terms are set by the company.

For Cobalt Power Systems

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
C

Cobalt Power Systems

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.