S

Solar Energy Consultants in San Jose

San Jose, California·Solar Installation
ResidentialCommercial

10+ yrs

Experience

3118+

Projects

60 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solar Energy Consultants

San Jose solar, roofing, and whole-home electrification specialists since 2016, with 3,118+ projects completed and all in-house crews

San Jose, California 95138

San Jose, California 95138

Services Offered

Solar InstallationBattery StorageSolar DesignRoof AssessmentEnergy AuditGrid ConnectionMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedCSLB Licensed

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

San Jose, CaliforniaMilpitas, CaliforniaSanta Clara, CaliforniaFremont, CaliforniaCampbell, CaliforniaLos Gatos, CaliforniaMorgan Hill, California

Customer Reviews

No reviews yet. Be the first to review Solar Energy Consultants!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar Energy Consultants?

You can request a quote through the form on this page or contact Solar Energy Consultants directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar Energy Consultants serve?

Solar Energy Consultants is based in San Jose and serves within a 60 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar Energy Consultants hold?

This profile lists the following reported certifications: BBB Accredited, CSLB Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solar Energy Consultants offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Solar Energy Consultants for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar Energy Consultants for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar Energy Consultants handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar Energy Consultants which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2016
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar Energy Consultants

Send your project details to request follow-up from Solar Energy Consultants. Response timing and consultation terms are set by the company.

For Solar Energy Consultants

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar Energy Consultants

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.