Pickett Solar in Fresno
38+ yrs
Experience
200 km
Service radius
11-50
Employees
Profile information
About Pickett Solar
Family-owned commercial solar contractor with in-house engineering serving California's Central Valley since 1988
Fresno, California 93711
Fresno, California 93711
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Pickett Solar!
Frequently Asked Questions
How do I get a quote from Pickett Solar?
You can request a quote through the form on this page or contact Pickett Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Pickett Solar serve?
Pickett Solar is based in Fresno and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Pickett Solar hold?
This profile lists the following reported certifications: CSLB License 541612, CALSEIA Member, Building Industry Association Member. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Pickett Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Pickett Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Pickett Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Pickett Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Pickett Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Pickett Solar
Send your project details to request follow-up from Pickett Solar. Response timing and consultation terms are set by the company.
For Pickett Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Pickett Solar