S

Sunline Energy in San Diego

San Diego, California·Solar Installation
Residential

14+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Sunline Energy

San Diego's best-reviewed solar company on Yelp, specializing in solar, battery, EV charging, and roofing

San Diego, California 92121

San Diego, California 92121

Services Offered

Solar InstallationBattery StorageEV ChargingroofingMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedNABCEPTesla CertifiedCSLB Licensed

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

QcellsREC

Inverters

Enphase

Batteries

Tesla PowerwallEnphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

San Diego, CaliforniaLa Jolla, CaliforniaDel Mar, CaliforniaEncinitas, CaliforniaCarlsbad, CaliforniaPoway, CaliforniaEscondido, California

Customer Reviews

No reviews yet. Be the first to review Sunline Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Sunline Energy?

You can request a quote through the form on this page or contact Sunline Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Sunline Energy serve?

Sunline Energy is based in San Diego and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Sunline Energy hold?

This profile lists the following reported certifications: BBB Accredited, NABCEP, Tesla Certified, CSLB Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Sunline Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Sunline Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Sunline Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Sunline Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Sunline Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2012
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Sunline Energy

Send your project details to request follow-up from Sunline Energy. Response timing and consultation terms are set by the company.

For Sunline Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Sunline Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.