S

Superior Solar Inc in Stockton

Stockton, California·Solar Installation
ResidentialCommercial

16+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Superior Solar Inc

SunPower certified dealer in Roseville specializing in residential, commercial, and agricultural solar across the Central Valley

Stockton, California 95678

Stockton, California 95678

Services Offered

Solar InstallationSolar Design

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

SunPower Certified DealerBBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Stockton, CaliforniaRoseville, CaliforniaSacramento, CaliforniaLodi, CaliforniaElk Grove, CaliforniaRancho Cordova, California

Customer Reviews

No reviews yet. Be the first to review Superior Solar Inc!

Write a Review

Frequently Asked Questions

How do I get a quote from Superior Solar Inc?

You can request a quote through the form on this page or contact Superior Solar Inc directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Superior Solar Inc serve?

Superior Solar Inc is based in Stockton and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Superior Solar Inc hold?

This profile lists the following reported certifications: SunPower Certified Dealer, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Superior Solar Inc offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Superior Solar Inc for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Superior Solar Inc for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Superior Solar Inc handle permits and paperwork?

The exact scope is not verified on this profile. Ask Superior Solar Inc which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2010
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Superior Solar Inc

Send your project details to request follow-up from Superior Solar Inc. Response timing and consultation terms are set by the company.

For Superior Solar Inc

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Superior Solar Inc

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.