S

Solar Source in Long Beach

Long Beach, California·Solar Installation
ResidentialCommercial

18+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solar Source

Published directory profile for Solar Source in Long Beach. Verify services, credentials, ratings, and references directly with their original sources.

Long Beach, California 90804

Long Beach, California 90804

Services Offered

Solar InstallationSolar DesignGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

C-46 Solar Contractor LicenseBBB Accredited

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Long Beach, CaliforniaLakewood, CaliforniaSignal Hill, CaliforniaSeal Beach, CaliforniaCarson, CaliforniaTorrance, California

Customer Reviews

No reviews yet. Be the first to review Solar Source!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar Source?

You can request a quote through the form on this page or contact Solar Source directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar Source serve?

Solar Source is based in Long Beach and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar Source hold?

This profile lists the following reported certifications: C-46 Solar Contractor License, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solar Source offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar Source for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar Source for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar Source handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar Source which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar Source

Send your project details to request follow-up from Solar Source. Response timing and consultation terms are set by the company.

For Solar Source

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar Source

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.