L

Luminalt in San Francisco

San Francisco, California·Solar Installation
ResidentialCommercial

22+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Luminalt

San Francisco's leading locally owned solar and energy storage installer since 2004

San Francisco, California 94103

San Francisco, California 94103

Services Offered

Solar InstallationBattery StorageMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

CSLB LicensedSunPower Certified Dealer

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Inverters

SunPower

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

San Francisco, CaliforniaOakland, CaliforniaBerkeley, CaliforniaDaly City, CaliforniaSan Mateo, CaliforniaMarin County, California

Customer Reviews

No reviews yet. Be the first to review Luminalt!

Write a Review

Frequently Asked Questions

How do I get a quote from Luminalt?

You can request a quote through the form on this page or contact Luminalt directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Luminalt serve?

Luminalt is based in San Francisco and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Luminalt hold?

This profile lists the following reported certifications: CSLB Licensed, SunPower Certified Dealer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Luminalt offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Luminalt for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Luminalt for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Luminalt handle permits and paperwork?

The exact scope is not verified on this profile. Ask Luminalt which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2004
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Luminalt

Send your project details to request follow-up from Luminalt. Response timing and consultation terms are set by the company.

For Luminalt

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.