S

SunMade Smart Roofing Solar & Electric in Fresno

Fresno, California·Solar Installation
Residential

10+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About SunMade Smart Roofing Solar & Electric

Diamond Certified solar, roofing, and electrical contractor serving the Central Valley since 2016

Fresno, California 93722

Fresno, California 93722

Services Offered

Solar InstallationBattery StorageroofingMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Diamond CertifiedBBB A+C-46 Solar LicenseC-39 Roofing LicenseC-10 Electrical LicenseGenerac PWRCell Certified Installer

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SunPower

Inverters

Enphase

Batteries

Generac PWRCell

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Fresno, CaliforniaClovis, CaliforniaVisalia, CaliforniaMadera, CaliforniaTulare, California

Customer Reviews

No reviews yet. Be the first to review SunMade Smart Roofing Solar & Electric!

Write a Review

Frequently Asked Questions

How do I get a quote from SunMade Smart Roofing Solar & Electric?

You can request a quote through the form on this page or contact SunMade Smart Roofing Solar & Electric directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does SunMade Smart Roofing Solar & Electric serve?

SunMade Smart Roofing Solar & Electric is based in Fresno and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does SunMade Smart Roofing Solar & Electric hold?

This profile lists the following reported certifications: Diamond Certified, BBB A+, C-46 Solar License, C-39 Roofing License, C-10 Electrical License, Generac PWRCell Certified Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does SunMade Smart Roofing Solar & Electric offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask SunMade Smart Roofing Solar & Electric for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask SunMade Smart Roofing Solar & Electric for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does SunMade Smart Roofing Solar & Electric handle permits and paperwork?

The exact scope is not verified on this profile. Ask SunMade Smart Roofing Solar & Electric which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2016
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from SunMade Smart Roofing Solar & Electric

Send your project details to request follow-up from SunMade Smart Roofing Solar & Electric. Response timing and consultation terms are set by the company.

For SunMade Smart Roofing Solar & Electric

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

SunMade Smart Roofing Solar & Electric

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.