A

American Array Solar and Roofing in Los Angeles

Los Angeles, California·Solar Installation
ResidentialCommercial

14+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About American Array Solar and Roofing

GAF Master Elite solar and roofing contractor with 80+ years of combined experience and no subcontractors

Los Angeles, California 91311

Los Angeles, California 91311

Services Offered

Solar InstallationBattery StorageRoof AssessmentSolar DesignEnergy AuditMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

GAF CertifiedPanasonic CertifiedEnphase Gold

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

PanasonicREC

Inverters

Enphase

Batteries

Tesla PowerwallEnphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Los Angeles, CaliforniaChatsworth, CaliforniaWoodland Hills, CaliforniaNorthridge, CaliforniaSimi Valley, CaliforniaThousand Oaks, CaliforniaWest Hills, CaliforniaCalabasas, CaliforniaLivermore, CaliforniaSan Fernando Valley, California

Customer Reviews

No reviews yet. Be the first to review American Array Solar and Roofing!

Write a Review

Frequently Asked Questions

How do I get a quote from American Array Solar and Roofing?

You can request a quote through the form on this page or contact American Array Solar and Roofing directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does American Array Solar and Roofing serve?

American Array Solar and Roofing is based in Los Angeles and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does American Array Solar and Roofing hold?

This profile lists the following reported certifications: GAF Certified, Panasonic Certified, Enphase Gold. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does American Array Solar and Roofing offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask American Array Solar and Roofing for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask American Array Solar and Roofing for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does American Array Solar and Roofing handle permits and paperwork?

The exact scope is not verified on this profile. Ask American Array Solar and Roofing which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2012
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from American Array Solar and Roofing

Send your project details to request follow-up from American Array Solar and Roofing. Response timing and consultation terms are set by the company.

For American Array Solar and Roofing

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

American Array Solar and Roofing

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.