Solar Installers in Texas

Compare published solar company information across Texas, verify credentials directly, and request quotes from local installers.

50 Companies8 Cities0 Reviews

All Solar Installers in Texas

50 solar companies across Texas

5S

512 Solar

Est. 2014·Austin, Texas·Reported 25yr warranty
SolarMaintenanceMonitoringDesign

Reported credentials: NABCEP

REC + Enphase

AE

Alba Energy

Est. 2013·Austin, Texas·Reported 25yr warranty
SolarBatteryDesignCommercial

Reported credentials: BBB Accredited · NABCEP

Qcells + Enphase

AD

American Dream Solar

Est. 2021·Fort Worth, Texas·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: NABCEP

AS

Apollo Solar

Est. 2019·El Paso, Texas·Reported 25yr warranty
SolarBatteryDesign

Reported credentials: BBB Accredited

AS

Astrawatt Solar

Est. 2016·Houston, Texas·Reported 25yr warranty
SolarBattery

REC + Enphase

AE

Atma Energy

Est. 2020·San Antonio, Texas·Reported 25yr warranty
SolarBatteryEnergy AuditDesign

Reported credentials: Enphase Platinum Installer · SEIA Member

Qcells + Enphase

AS

ATX Solar

Est. 2019·Austin, Texas·Reported 25yr warranty
SolarBatteryDesignEnergy Audit

Reported credentials: NABCEP

Qcells + Enphase

BS

Bright Solar

Est. 2021·Dallas, Texas·Reported 25yr warranty
SolarBattery

Reported credentials: BBB A Rating

CE

Clark Energies

Est. 2022·El Paso, Texas·Reported 25yr warranty
SolarBatteryDesignGrid Connection

Reported credentials: BBB Accredited

ES

Eagle Solar Power

Est. 2019·Arlington, Texas·Reported 25yr warranty
SolarBatteryMaintenanceDesign

Reported credentials: BBB Accredited

EE

EcoVantage Energy

Est. 2001·Fort Worth, Texas·Reported 25yr warranty
SolarBattery
ES

Elias Solar

Est. 2016·Houston, Texas·Reported 25yr warranty
SolarBatteryMaintenance

Reported credentials: NABCEP Board Certified · BBB A+ · Texas Electrician License (36539)

LG Solar + Enphase

How We Rank Solar Installers

Directory ordering uses currently published profile information such as claimed status, stated experience, services, and warranty fields. Verify all company claims before hiring.

Customer Reviews

Ratings are not republished unless SurgePV can document their source and verification. Check current feedback on the original platform.

Certifications

NABCEP certification is the US gold standard. We also check for state licensing, BBB accreditation, and manufacturer certifications.

Track Record

Published profile fields help users compare companies. These details are not a quality score and must be verified directly.

Why Trust the SurgePV Directory?

Profiles compile available company information for comparison. SurgePV does not guarantee licensing, certification, active-trading status, or service quality. Verify each item directly.

50

Published Profiles

0

Customer Reviews

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Frequently Asked Questions

How much do solar panels cost in Texas?

Solar panel costs in Texas typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. State and local incentives, net metering, and SRECs may help reduce your net cost.

What certifications should I look for?

NABCEP (North American Board of Certified Energy Practitioners) certification is the gold standard. At minimum, your installer should hold the required Texas state contractor license, carry liability insurance and workers' compensation, and have manufacturer certifications for the equipment they install.

What solar incentives are available in Texas?

The 30% federal residential solar tax credit expired on December 31, 2025. Homeowners in Texas can no longer claim this federal credit for new installations. State-level incentives may still be available, including state tax credits, rebates, property tax exemptions, sales tax exemptions, net metering, and SRECs. Commercial projects may still qualify for the federal ITC under transition rules. Check with your installer or visit the DSIRE database for current Texas-specific incentives.

Are You a Solar Installer in Texas?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.