North Texas Solar in Fort Worth
11+ yrs
Experience
80 km
Service radius
1-10
Employees
Profile information
About North Texas Solar
DFW solar installation and off-grid energy solutions since 2015
Fort Worth, Texas 76137
Fort Worth, Texas 76137
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review North Texas Solar!
Frequently Asked Questions
How do I get a quote from North Texas Solar?
You can request a quote through the form on this page or contact North Texas Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does North Texas Solar serve?
North Texas Solar is based in Fort Worth and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does North Texas Solar hold?
This profile does not list independently verified certifications. Ask North Texas Solar for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does North Texas Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask North Texas Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask North Texas Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does North Texas Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask North Texas Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from North Texas Solar
Send your project details to request follow-up from North Texas Solar. Response timing and consultation terms are set by the company.
For North Texas Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
North Texas Solar