T

Texas Solar Professional in Houston

Houston, Texas·Solar Installation
Residential

6+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Texas Solar Professional

Published directory profile for Texas Solar Professional in Houston. Verify services, credentials, ratings, and references directly with their original sources.

Houston, Texas 77099

Houston, Texas 77099

Services Offered

Solar InstallationBattery Storageroofing

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB A+Tesla Powerwall Certified

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Houston, TexasKaty, TexasSugar Land, TexasPearland, TexasLeague City, TexasGalveston, Texas

Customer Reviews

No reviews yet. Be the first to review Texas Solar Professional!

Write a Review

Frequently Asked Questions

How do I get a quote from Texas Solar Professional?

You can request a quote through the form on this page or contact Texas Solar Professional directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Texas Solar Professional serve?

Texas Solar Professional is based in Houston and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Texas Solar Professional hold?

This profile lists the following reported certifications: NABCEP, BBB A+, Tesla Powerwall Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Texas Solar Professional offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Texas Solar Professional for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Texas Solar Professional for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Texas Solar Professional handle permits and paperwork?

The exact scope is not verified on this profile. Ask Texas Solar Professional which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2020
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Texas Solar Professional

Send your project details to request follow-up from Texas Solar Professional. Response timing and consultation terms are set by the company.

For Texas Solar Professional

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
T

Texas Solar Professional

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.