Solartime USA in Fort Worth
17+ yrs
Experience
29000+
Projects
80 km
Service radius
51-200
Employees
Profile information
About Solartime USA
Family-owned DFW solar company with over 29,000 installations since 2009
Fort Worth, Texas 75081
Fort Worth, Texas 75081
Services Offered
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solartime USA!
Frequently Asked Questions
How do I get a quote from Solartime USA?
You can request a quote through the form on this page or contact Solartime USA directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solartime USA serve?
Solartime USA is based in Fort Worth and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solartime USA hold?
This profile does not list independently verified certifications. Ask Solartime USA for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does Solartime USA offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solartime USA for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solartime USA for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solartime USA handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solartime USA which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Solartime USA
Send your project details to request follow-up from Solartime USA. Response timing and consultation terms are set by the company.
For Solartime USA
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solartime USA