G

Good Faith Energy in Dallas

Dallas, Texas·Solar Installation
ResidentialCommercial

12+ yrs

Experience

80 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Good Faith Energy

Published directory profile for Good Faith Energy in Dallas. Verify services, credentials, ratings, and references directly with their original sources.

Dallas, Texas 75001

Dallas, Texas 75001

Services Offered

Solar InstallationBattery StorageEV Chargingroofing

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPBBB AccreditedTesla Certified InstallerEnphase Gold InstallerREC Certified InstallerPanasonic Elite Installer

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

RECPanasonic

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallTesla Solar Roof

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Dallas, TexasAddison, TexasPlano, TexasFrisco, TexasMcKinney, TexasFort Worth, TexasArlington, Texas

Customer Reviews

No reviews yet. Be the first to review Good Faith Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Good Faith Energy?

You can request a quote through the form on this page or contact Good Faith Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Good Faith Energy serve?

Good Faith Energy is based in Dallas and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Good Faith Energy hold?

This profile lists the following reported certifications: NABCEP, BBB Accredited, Tesla Certified Installer, Enphase Gold Installer, REC Certified Installer, Panasonic Elite Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Good Faith Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Good Faith Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Good Faith Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Good Faith Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Good Faith Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2014
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Good Faith Energy

Send your project details to request follow-up from Good Faith Energy. Response timing and consultation terms are set by the company.

For Good Faith Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
G

Good Faith Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.