NATiVE Solar in Austin
19+ yrs
Experience
1000+
Projects
160 km
Service radius
11-50
Employees
Profile information
About NATiVE Solar
One of the longest-running Texas-owned solar installers with over 1,000 projects and 60 MW installed statewide
Austin, Texas 78702
Austin, Texas 78702
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review NATiVE Solar!
Frequently Asked Questions
How do I get a quote from NATiVE Solar?
You can request a quote through the form on this page or contact NATiVE Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does NATiVE Solar serve?
NATiVE Solar is based in Austin and serves within a 160 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does NATiVE Solar hold?
This profile lists the following reported certifications: NABCEP, BBB Accredited, Amicus Solar Cooperative Member. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does NATiVE Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask NATiVE Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask NATiVE Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does NATiVE Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask NATiVE Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from NATiVE Solar
Send your project details to request follow-up from NATiVE Solar. Response timing and consultation terms are set by the company.
For NATiVE Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
NATiVE Solar