A

Alba Energy in Austin

Austin, Texas·Solar Installation
ResidentialCommercial

13+ yrs

Experience

160 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Alba Energy

Premier Texas solar EPC firm specializing in high-quality commercial and residential PV systems since 2013

Austin, Texas 78701

Austin, Texas 78701

Services Offered

Solar InstallationBattery StorageSolar DesignCommercial SolarGrid ConnectionEnergy AuditMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedNABCEP

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

QcellsCanadian SolarTrina Solar

Inverters

EnphaseSolarEdgeSMA

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Austin, TexasSan Antonio, TexasHouston, TexasDallas, TexasRound Rock, TexasGeorgetown, TexasKyle, TexasNew Braunfels, Texas

Customer Reviews

No reviews yet. Be the first to review Alba Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from Alba Energy?

You can request a quote through the form on this page or contact Alba Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Alba Energy serve?

Alba Energy is based in Austin and serves within a 160 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Alba Energy hold?

This profile lists the following reported certifications: BBB Accredited, NABCEP. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Alba Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Alba Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Alba Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Alba Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask Alba Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Request a Quote

Business Details

Founded2013
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Alba Energy

Send your project details to request follow-up from Alba Energy. Response timing and consultation terms are set by the company.

For Alba Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

Alba Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.