KW Solar in Houston
11+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About KW Solar
Houston-born solar installer since 2015 serving residential and commercial customers across the Gulf Coast
Houston, Texas 77032
Houston, Texas 77032
Services Offered
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Panels
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review KW Solar!
Frequently Asked Questions
How do I get a quote from KW Solar?
You can request a quote through the form on this page or contact KW Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does KW Solar serve?
KW Solar is based in Houston and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does KW Solar hold?
This profile does not list independently verified certifications. Ask KW Solar for current license, insurance, and credential details, then confirm them with the relevant authority.
What warranty does KW Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask KW Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask KW Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does KW Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask KW Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from KW Solar
Send your project details to request follow-up from KW Solar. Response timing and consultation terms are set by the company.
For KW Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
KW Solar