B

Bright Solar in Dallas

Dallas, Texas·Solar Installation
ResidentialCommercialIndustrial

5+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Bright Solar

Published directory profile for Bright Solar in Dallas. Verify services, credentials, ratings, and references directly with their original sources.

Dallas, Texas 75201

Dallas, Texas 75201

Services Offered

Solar InstallationBattery Storage

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB A Rating

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Dallas, TexasFort Worth, TexasArlington, TexasPlano, TexasFrisco, TexasHouston, TexasSan Antonio, TexasAustin, Texas

Customer Reviews

No reviews yet. Be the first to review Bright Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Bright Solar?

You can request a quote through the form on this page or contact Bright Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Bright Solar serve?

Bright Solar is based in Dallas and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Bright Solar hold?

This profile lists the following reported certifications: BBB A Rating. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Bright Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Bright Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Bright Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Bright Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Bright Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2021
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Bright Solar

Send your project details to request follow-up from Bright Solar. Response timing and consultation terms are set by the company.

For Bright Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
B

Bright Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.