Apollo Solar in El Paso
7+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About Apollo Solar
El Paso solar installer offering battery storage and panel installations with clear pricing and free quotes
El Paso, Texas 79901
El Paso, Texas 79901
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Apollo Solar!
Frequently Asked Questions
How do I get a quote from Apollo Solar?
You can request a quote through the form on this page or contact Apollo Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Apollo Solar serve?
Apollo Solar is based in El Paso and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Apollo Solar hold?
This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Apollo Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Apollo Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Apollo Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Apollo Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask Apollo Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Apollo Solar
Send your project details to request follow-up from Apollo Solar. Response timing and consultation terms are set by the company.
For Apollo Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Apollo Solar