Solar Installers in Florida

Compare published solar company information across Florida, verify credentials directly, and request quotes from local installers.

54 Companies6 Cities0 Reviews

Find Solar Installers by City

Browse 6 cities in Florida. Select a city to see local installers.

All Solar Installers in Florida

54 solar companies across Florida

AS

A1A Solar Contracting

Est. 2010·Jacksonville, Florida·Reported 25yr warranty
SolarBatteryDesignEnergy Audit

Reported credentials: NABCEP Company Accredited · BBB A+ · Tesla Certified Installer · Enphase Gold Dealer

Tesla + Enphase

AS

Add Solar & Electrical

Est. 2021·Miami, Florida·Reported 25yr warranty
SolarBatteryEV ChargingDesign

Reported credentials: BBB Accredited · State Certified Electrical Contractor · State Certified Solar Contractor

AE

Airis Energy Solutions

Est. 1996·Miami, Florida·Reported 25yr warranty
SolarBatteryMaintenanceMonitoring

Reported credentials: State Certified Solar Contractor

AS

All Solar Power

Est. 1977·Tampa, Florida·Reported 25yr warranty
SolarMaintenancesolar_pool_heating

Reported credentials: NABCEP

Luma Solar

AS

American Solar Energy Systems

Est. 1979·Jacksonville, Florida·Reported 25yr warranty
SolarDesignMaintenanceGrid Connection

Reported credentials: BBB Accredited · FL Licensed Solar Contractor

Qcells + Enphase

BA

Bay Area Solar Solutions

Est. 2018·St. Petersburg, Florida·Reported 25yr warranty
SolarDesignGrid Connection
BS

Bluenergy Solar

Est. 2019·Jacksonville, Florida·Reported 25yr warranty
SolarBatteryDesignGrid Connection

Reported credentials: BBB Accredited · FL Licensed Solar Contractor

Qcells + Enphase

BH

Bob Heinmiller Solar

Est. 2011·Orlando, Florida·Reported 25yr warranty
SolarBatteryMaintenancesystem_design

Reported credentials: NABCEP · State Certified Electrical Contractor

Panasonic + SolarEdge

BH

Brilliant Harvest

Est. 2009·Sarasota, Florida·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: NABCEP · Tesla Energy Certified Installer · State Certified Solar Contractor · BBB A+ Rating

Tesla

BH

Brilliant Harvest

Est. 2009·St. Petersburg, Florida·Reported 25yr warranty
SolarDesignGrid Connection
CE

Castaways Energy

Est. 2019·Orlando, Florida·Reported 25yr warranty
SolarBatterysystem_design

Reported credentials: NABCEP

CS

Clay Solar Installation Partners

Est. 2022·Jacksonville, Florida·Reported 25yr warranty
SolarBatteryDesignMaintenance

Reported credentials: BBB Accredited · FL Licensed Solar Contractor

Qcells + Enphase

How We Rank Solar Installers

Directory ordering uses currently published profile information such as claimed status, stated experience, services, and warranty fields. Verify all company claims before hiring.

Customer Reviews

Ratings are not republished unless SurgePV can document their source and verification. Check current feedback on the original platform.

Certifications

NABCEP certification is the US gold standard. We also check for state licensing, BBB accreditation, and manufacturer certifications.

Track Record

Published profile fields help users compare companies. These details are not a quality score and must be verified directly.

Why Trust the SurgePV Directory?

Profiles compile available company information for comparison. SurgePV does not guarantee licensing, certification, active-trading status, or service quality. Verify each item directly.

54

Published Profiles

0

Customer Reviews

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Frequently Asked Questions

How much do solar panels cost in Florida?

Solar panel costs in Florida typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. State and local incentives, net metering, and SRECs may help reduce your net cost.

What certifications should I look for?

NABCEP (North American Board of Certified Energy Practitioners) certification is the gold standard. At minimum, your installer should hold the required Florida state contractor license, carry liability insurance and workers' compensation, and have manufacturer certifications for the equipment they install.

What solar incentives are available in Florida?

The 30% federal residential solar tax credit expired on December 31, 2025. Homeowners in Florida can no longer claim this federal credit for new installations. State-level incentives may still be available, including state tax credits, rebates, property tax exemptions, sales tax exemptions, net metering, and SRECs. Commercial projects may still qualify for the federal ITC under transition rules. Check with your installer or visit the DSIRE database for current Florida-specific incentives.

Are You a Solar Installer in Florida?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.