P

PES Solar in Orlando

Orlando, Florida·Solar Installation
ResidentialCommercial

29+ yrs

Experience

120 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About PES Solar

Family-owned solar installer serving Florida since 1997 with over one million panels installed

Orlando, Florida 32750

Orlando, Florida 32750

Services Offered

Solar InstallationBattery Storagesystem_design

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Orlando, FloridaLongwood, FloridaWinter Park, FloridaKissimmee, FloridaDaytona Beach, FloridaTampa, Florida

Customer Reviews

No reviews yet. Be the first to review PES Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from PES Solar?

You can request a quote through the form on this page or contact PES Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does PES Solar serve?

PES Solar is based in Orlando and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does PES Solar hold?

This profile does not list independently verified certifications. Ask PES Solar for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does PES Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask PES Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask PES Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does PES Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask PES Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1997
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from PES Solar

Send your project details to request follow-up from PES Solar. Response timing and consultation terms are set by the company.

For PES Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
P

PES Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.