S

Solar Energy Labs in Jacksonville

Jacksonville, Florida·Solar Installation
ResidentialCommercial

53+ yrs

Experience

100 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solar Energy Labs

Jacksonville's oldest solar provider since 1973, with over 50 years of installation and service experience

Jacksonville, Florida 32254

Jacksonville, Florida 32254

Services Offered

Solar InstallationBattery StorageSolar DesignMaintenanceGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

BBB AccreditedFL Certified Solar Contractor CVC56672

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

QcellsCanadian Solar

Inverters

EnphaseSolarEdge

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Jacksonville, FloridaOrange Park, FloridaSt. Augustine, FloridaJacksonville Beach, FloridaFernandina Beach, FloridaPonte Vedra Beach, Florida

Customer Reviews

No reviews yet. Be the first to review Solar Energy Labs!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar Energy Labs?

You can request a quote through the form on this page or contact Solar Energy Labs directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar Energy Labs serve?

Solar Energy Labs is based in Jacksonville and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar Energy Labs hold?

This profile lists the following reported certifications: BBB Accredited, FL Certified Solar Contractor CVC56672. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solar Energy Labs offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar Energy Labs for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar Energy Labs for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar Energy Labs handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar Energy Labs which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded1973
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar Energy Labs

Send your project details to request follow-up from Solar Energy Labs. Response timing and consultation terms are set by the company.

For Solar Energy Labs

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar Energy Labs

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.