S

Solar22 in St. Petersburg

St. Petersburg, Florida·Solar Installation
ResidentialCommercial

8+ yrs

Experience

80 km

Service radius

1-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solar22

Tampa Bay clean energy specialist providing solar installation, repair, and maintenance across the region

St. Petersburg, Florida 34698

St. Petersburg, Florida 34698

Services Offered

Solar InstallationMaintenanceSolar Design

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

St. Petersburg, FloridaTampa, FloridaClearwater, FloridaDunedin, FloridaPalm Harbor, FloridaLargo, Florida

Customer Reviews

No reviews yet. Be the first to review Solar22!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar22?

You can request a quote through the form on this page or contact Solar22 directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar22 serve?

Solar22 is based in St. Petersburg and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar22 hold?

This profile does not list independently verified certifications. Ask Solar22 for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does Solar22 offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar22 for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar22 for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar22 handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar22 which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2018
Employees1-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar22

Send your project details to request follow-up from Solar22. Response timing and consultation terms are set by the company.

For Solar22

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.