A

A1A Solar Contracting in Jacksonville

Jacksonville, Florida·Solar Installation
ResidentialCommercial

16+ yrs

Experience

150 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About A1A Solar Contracting

Published directory profile for A1A Solar Contracting in Jacksonville. Verify services, credentials, ratings, and references directly with their original sources.

Jacksonville, Florida 32226

Jacksonville, Florida 32226

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid ConnectionMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP Company AccreditedBBB A+Tesla Certified InstallerEnphase Gold DealerFL Solar Contractor CVC 56771FL Electrical Contractor EC 13001175FL General Contractor CGC 1513100

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

TeslaCanadian Solar

Inverters

EnphaseTesla

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Jacksonville, FloridaSt. Augustine, FloridaJacksonville Beach, FloridaFernandina Beach, FloridaOrange Park, FloridaPonte Vedra Beach, FloridaBrunswick, Florida

Customer Reviews

No reviews yet. Be the first to review A1A Solar Contracting!

Write a Review

Frequently Asked Questions

How do I get a quote from A1A Solar Contracting?

You can request a quote through the form on this page or contact A1A Solar Contracting directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does A1A Solar Contracting serve?

A1A Solar Contracting is based in Jacksonville and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does A1A Solar Contracting hold?

This profile lists the following reported certifications: NABCEP Company Accredited, BBB A+, Tesla Certified Installer, Enphase Gold Dealer, FL Solar Contractor CVC 56771, FL Electrical Contractor EC 13001175, FL General Contractor CGC 1513100. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does A1A Solar Contracting offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask A1A Solar Contracting for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask A1A Solar Contracting for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does A1A Solar Contracting handle permits and paperwork?

The exact scope is not verified on this profile. Ask A1A Solar Contracting which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2010
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from A1A Solar Contracting

Send your project details to request follow-up from A1A Solar Contracting. Response timing and consultation terms are set by the company.

For A1A Solar Contracting

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

A1A Solar Contracting

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.