U

Urban Solar in Miami

Miami, Florida·Solar Installation
ResidentialCommercial

18+ yrs

Experience

10000+

Projects

150 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Urban Solar

Florida's premier solar installer with over 10,000 completed installations since 2008

Miami, Florida 33487

Miami, Florida 33487

Services Offered

Solar InstallationBattery StorageMaintenanceMonitoringSolar DesignRoof Assessment

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

State Certified Solar ContractorState Certified Electrical ContractorTesla Powerwall Certified InstallerEnphase Platinum Installer

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Q CellsJinko SolarMission Solar

Inverters

EnphaseSolarEdgeSMA

Batteries

Tesla Powerwall

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Miami, FloridaFort Lauderdale, FloridaBoca Raton, FloridaWest Palm Beach, FloridaMiami Beach, FloridaCoral Gables, FloridaHollywood, FloridaPompano Beach, Florida

Customer Reviews

No reviews yet. Be the first to review Urban Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Urban Solar?

You can request a quote through the form on this page or contact Urban Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Urban Solar serve?

Urban Solar is based in Miami and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Urban Solar hold?

This profile lists the following reported certifications: State Certified Solar Contractor, State Certified Electrical Contractor, Tesla Powerwall Certified Installer, Enphase Platinum Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Urban Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Urban Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Urban Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Urban Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Urban Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2008
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Urban Solar

Send your project details to request follow-up from Urban Solar. Response timing and consultation terms are set by the company.

For Urban Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
U

Urban Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.