P

PowerSol USA in Tampa

Tampa, Florida·Solar Installation
ResidentialCommercial

6+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About PowerSol USA

Published directory profile for PowerSol USA in Tampa. Verify services, credentials, ratings, and references directly with their original sources.

Tampa, Florida 33605

Tampa, Florida 33605

Services Offered

Solar InstallationBattery StorageEV Chargingsystem_design

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Tampa, FloridaSt. Petersburg, FloridaClearwater, FloridaBrandon, FloridaLakeland, FloridaSarasota, Florida

Customer Reviews

No reviews yet. Be the first to review PowerSol USA!

Write a Review

Frequently Asked Questions

How do I get a quote from PowerSol USA?

You can request a quote through the form on this page or contact PowerSol USA directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does PowerSol USA serve?

PowerSol USA is based in Tampa and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does PowerSol USA hold?

This profile does not list independently verified certifications. Ask PowerSol USA for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does PowerSol USA offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask PowerSol USA for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask PowerSol USA for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does PowerSol USA handle permits and paperwork?

The exact scope is not verified on this profile. Ask PowerSol USA which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2020
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from PowerSol USA

Send your project details to request follow-up from PowerSol USA. Response timing and consultation terms are set by the company.

For PowerSol USA

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
P

PowerSol USA

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.