Back to Blog
solar roi27 min read

Electricity Prices Europe 2026: Solar ROI

EU household electricity prices by country in H1 2026 (Eurostat) and how price, sun and self-consumption set solar payback.

Akash Hirpara

Written by

Akash Hirpara

Co-Founder · SurgePV

Rainer Neumann

Edited by

Rainer Neumann

Editorial contributor · SurgePV

Published ·Updated

Answer

Household electricity prices in the EU averaged €0.2832 per kWh in H1 2026, from €0.1139 in Hungary to €0.3871 in Ireland, according to Eurostat. Higher prices raise the value of self-consumed solar, but sun matters as much: in this guide's illustration, a price €0.10 per kWh lower adds about two years to payback.

Electricity price is one of the biggest variables that decides whether solar pays back in 6 years or 16. Across the EU, Eurostat reports household prices from €0.1139 per kWh in Hungary to €0.3871 in Ireland for the first half of 2026, a spread of more than three to one. Where your market sits on that spectrum, and why, is the foundation of any credible solar investment case.

Last updated: November 2026

This guide uses the latest Eurostat electricity price statistics, data extracted in October 2026. It compares household and non-household prices, explains how taxes distort the comparison, and then turns prices into payback with a worked, clearly labeled illustration. The payback figures are arithmetic on stated assumptions, not national benchmarks or quotes.

TL;DR: Electricity Prices and Solar ROI in Europe

The EU household average was €0.2832 per kWh in H1 2026, down 1.6% on H1 2025. Ireland (€0.3871), Germany (€0.3618) and Belgium (€0.3575) were highest; Hungary (€0.1139), Malta (€0.1268) and Bulgaria (€0.1341) were lowest. Solar ROI depends on price, sun and self-consumption together. In this guide’s illustration, a price €0.10 per kWh lower adds about two years to payback.

In this guide:

  • Eurostat household electricity prices for H1 2026 against H1 2025, by country
  • The payback formula, with a worked illustration across six markets
  • How taxes and levies distort price comparisons
  • Self-consumption: the variable that matters as much as price
  • How export compensation shapes system sizing
  • Commercial vs residential price dynamics
  • How to model price escalation scenarios for 25-year returns

Turn a tariff into a payback you can defend

Enter the customer’s tariff, yield and self-consumption in one financial model and compare scenarios side by side. Results depend on the inputs and assumptions you set.

Book a Demo

Checking cost first? See the SurgePV pricing page.


European Electricity Prices by Country: H1 2026 Eurostat Data

The table uses Eurostat data for household consumers with annual consumption between 2,500 and 5,000 kWh, prices including all taxes, levies and VAT. The change column is calculated in euro from the two half-year values. It can differ slightly from the percentages Eurostat quotes in national currency, for example Romania and Denmark.

Country H1 2026 (€/kWh) H1 2025 (€/kWh) Change
Ireland 0.3871 0.3231 +19.8%
Germany 0.3618 0.3835 -5.7%
Belgium 0.3575 0.3571 +0.1%
Austria 0.3260 0.2905 +12.2%
Italy 0.3142 0.3291 -4.5%
Sweden 0.3062 0.2654 +15.4%
Poland 0.2999 0.2559 +17.2%
Czechia 0.2884 0.3179 -9.3%
Romania 0.2836 0.1918 +47.9%
Finland 0.2694 0.2276 +18.4%
Spain 0.2509 0.2612 -3.9%
France 0.2485 0.2671 -7.0%
Netherlands 0.2440 0.2385 +2.3%
Greece 0.2401 0.2305 +4.2%
Denmark 0.2375 0.3485 -31.9%
Portugal 0.2367 0.2390 -1.0%
Luxembourg 0.2023 0.2665 -24.1%
Bulgaria 0.1341 0.1300 +3.2%
Malta 0.1268 0.1261 +0.6%
Hungary 0.1139 0.1040 +9.5%
EU average 0.2832 0.2879 -1.6%

Source: Eurostat, dataset nrg_pc_204, household consumers, band 2,500 to 4,999 kWh, euro per kWh including taxes, accessed November 2026.

Household electricity prices in selected EU countries, H1 2026 (euro per kWh, incl. taxes)
  • Ireland€0.387
  • Germany€0.362
  • Belgium€0.358
  • Italy€0.314
  • Poland€0.3
  • Spain€0.251
  • France€0.249
  • EU average€0.283
  • Hungary€0.114

Source: Eurostat nrg_pc_204, household band 2,500 to 5,000 kWh, checked November 2026.

Patterns That Define the European Price Map

The top of the table changed. In H1 2026 Ireland (€0.3871) overtook Germany (€0.3618) as the most expensive household market, with Belgium (€0.3575) third. Eurostat notes Irish households paid 37% above the EU average, while households in Hungary, Malta and Bulgaria paid less than half the average.

Prices moved in opposite directions. Denmark’s household price fell 31.7% year on year in national currency, and Luxembourg’s fell 24.1%, while Romania rose 51.9% and Ireland 19.8%, according to Eurostat. A single year can reshuffle the ranking, so use the latest half-year and not a number from an old article.

The low end is regulated and stable. Hungary, Malta and Bulgaria sit near €0.11 to €0.13 per kWh. At those prices, a solar kWh used on site saves little, so residential payback is long unless costs are low or prices rise.

Key Takeaway

Price is only half of the value equation. A solar kWh used on site saves the full retail price, while an exported kWh earns the export rate. The next sections turn Eurostat prices into payback so you can see how price, sun and self-consumption interact.


The Payback Formula: How Electricity Price Drives Solar ROI

The core calculation is straightforward. Where analysts go wrong is oversimplifying it.

Simple Payback Period = Net System Cost ÷ Annual Savings

Annual Savings = (Production × Self-Consumption Rate × Electricity Price) + (Production × Export Rate × Export Tariff)

Breaking this down:

  • Production: system size (kWp) × specific yield (kWh/kWp/year) for the location
  • Self-consumption rate: share of solar production used directly on site
  • Electricity price: the avoided cost per kWh at the full retail tariff, including taxes
  • Export rate: share of production sent to the grid, which is 1 minus the self-consumption rate
  • Export tariff: what the grid or supplier pays per exported kWh

The key point is that electricity price applies at full retail value only to the self-consumed share. Exported energy earns the export rate, which is usually lower. That is why self-consumption matters as much as the retail price in markets with low export compensation. For a deeper treatment of NPV and IRR alongside simple payback, see our post on solar NPV, IRR, and payback period calculations.

Worked Illustration: Same System, Six Markets

This illustration isolates the effect of price and sun. Every input except the retail price and yield is the same in all six markets, and none of the inputs is a quote or a national benchmark. Replace each one with real data before using the result.

  • System: 6 kWp residential
  • Assumed installed cost: €1,400 per kWp, or €8,400 in total, with no incentive
  • Assumed self-consumption: 35% of production, with 65% exported
  • Assumed export price: €0.07 per kWh in every market
  • Assumed specific yield: varies by market, listed in the table (replace with a PVGIS or site simulation)
  • Retail price: Eurostat H1 2026 household price from the table above
  • Not included: degradation, O&M, discounting and financing
Market Retail price (€/kWh) Assumed yield (kWh/kWp) Annual production (kWh) Annual benefit (€) Simple payback (years)
Ireland 0.3871 900 5,400 977 8.6
Germany 0.3618 950 5,700 981 8.6
Italy 0.3142 1,300 7,800 1,213 6.9
Spain 0.2509 1,500 9,000 1,200 7.0
Poland 0.2999 1,000 6,000 903 9.3
Hungary 0.1139 1,250 7,500 640 13.1

Take Germany as the worked line: 5,700 kWh × 35% = 1,995 kWh self-consumed at €0.3618 = €722, plus 3,705 kWh exported at €0.07 = €259, for €981 a year. Payback is €8,400 ÷ €981 = 8.6 years.

Simple payback in the illustration (illustrative example, not market data) (years)
  • Italy6.9 yrs
  • Spain7 yrs
  • Ireland8.6 yrs
  • Germany8.6 yrs
  • Poland9.3 yrs
  • Hungary13.1 yrs

Source: SurgePV arithmetic on assumed cost, yield, self-consumption and export price, with Eurostat H1 2026 retail prices (illustrative example, not market data), checked November 2026.

Three lessons come out of the table. First, Ireland and Germany, the two most expensive markets, do not pay back faster than Italy or Spain, because lower yield offsets the price advantage. Second, Spain and Italy are close despite a gap in retail price, because more sun makes up the difference. Third, Hungary’s low price is hard to overcome even with good yield, so payback is long.

How much is €0.10 per kWh worth? In the same illustration, a retail price €0.10 lower lengthens Germany’s payback from 8.6 to 10.8 years and Spain’s from 7.0 to 9.5 years, about two to two and a half years. That is arithmetic on assumed inputs, so treat it as a rule of thumb to test in your own model.

Pro Tip: Run These Numbers in Your Design Tool

The illustration uses one cost, one self-consumption rate and one export price for every market. Real projects need location-specific irradiance, hourly load profiles, the customer’s actual tariff band and price escalation scenarios. SurgePV’s generation and financial tool covers energy-yield and financial modeling, and results depend on the data you enter.


Country-by-Country Solar ROI Analysis

Each section gives the Eurostat price position and what it means for design. Export schemes and incentives change often, so check the current national rules before quoting. Our European solar incentives guide tracks them.

Germany: High Price, Modest Sun

Germany’s household price was €0.3618 per kWh in H1 2026, second only to Ireland, and down 5.7% from H1 2025. Eurostat reports taxes and levies at 34.0% of the German household price, the second-highest share in the EU after Poland.

That price level would give exceptional solar returns with Mediterranean sun, and Germany does not have it. In the illustration, Germany pays back in about 8.6 years, similar to Ireland and slower than Italy and Spain. Because the gap between the retail price and the export price is large, maximizing self-consumption is the main design lever. Export payments for small systems are set under the EEG and change on a published schedule, so take the current rate from the regulator.

Ireland: Highest Price, Rising Fast

Ireland had the highest household price in the EU in H1 2026 at €0.3871 per kWh, up 19.8% year on year. Irradiance is modest, so the illustration lands at about the same payback as Germany. The price trend matters: if prices stay near this level, the avoided cost per self-consumed kWh is the highest in the EU. Check the current export payment arrangement for small generators when you quote.

Belgium: High Price, Regional Rules

Belgium’s household price was €0.3575 per kWh in H1 2026, flat on H1 2025. Rules for solar owners differ by region (Flanders, Wallonia and Brussels), including how the grid charges prosumers and which certificates apply. Model the regional tariff structure, because grid charges can offset part of the self-consumption saving.

Italy: High Price Meets High Irradiance

Italy’s price was €0.3142 per kWh in H1 2026, down 4.5% on the year. With higher yield than the northern markets, Italy has one of the shorter payback figures in the illustration at 6.9 years, before any incentive. Italian residential incentives have changed from year to year, so apply the deduction or scheme that is in force on the contract date and show the result separately from the no-incentive figure.

Spain: Strong Yield, Moderate Price

Spain’s price was €0.2509 per kWh in H1 2026, down 3.9%, a little below the EU average of €0.2832. What makes Spain attractive is yield. In the illustration, 1,500 kWh per kWp produces a 7.0-year payback with only a middling retail price, which shows that irradiance can matter as much as price. Municipal tax reductions vary by town, so check local rules.

France: Moderate Price, Surplus Purchase Obligation

France’s price was €0.2485 per kWh in H1 2026, down 7.0%. French solar economics rely partly on a surplus purchase obligation (Obligation d’Achat) at tariffs set by the regulator, so the export price is a larger part of the return than in Germany. Look up the current tariff schedule and your customer’s installed power band before modeling.

Netherlands: Net Metering Ends in 2027

The Netherlands had a household price of €0.2440 per kWh in H1 2026, and Eurostat reports the lowest tax share in the EU at -9.9%. The bigger design issue is net metering. The Dutch government says on its solar energy page that households and small businesses may offset fed-in power against consumption until 2027, and that from 2027 this tax advantage ends, with suppliers paying a compensation for all electricity delivered back instead.

For systems installed now, model the post-2027 world: exported energy earns a supplier compensation and not the retail price, so self-consumption, load shifting and batteries matter more.

Poland: Prices Rising, Highest Tax Share

Poland’s household price was €0.2999 per kWh in H1 2026, up 17.2%, and Eurostat reports the EU’s highest tax and levy share at 46.9%. Because solar avoids the full retail price, including taxes, a high tax share raises the avoided cost per self-consumed kWh. Export compensation in Poland follows a net-billing approach, so size systems to consumption and verify the current rules.

Denmark: A Large Price Drop

Denmark’s household price fell from €0.3485 to €0.2375 per kWh between H1 2025 and H1 2026, a drop of about 32%, the largest in the EU according to Eurostat. That fall weakens the avoided-cost case for solar compared with a year earlier. Update any model that used Danish prices from 2025.

Portugal and Greece: Mid Prices, Strong Sun

Portugal’s household price was €0.2367 per kWh and Greece’s was €0.2401 in H1 2026, both near €0.24. Both markets have strong irradiance, so yield, not price, is the main driver of their returns. Check each country’s self-consumption and surplus rules.

Hungary and Bulgaria: Low Prices Limit Returns

Hungary (€0.1139) and Bulgaria (€0.1341) have among the lowest household prices in the EU, together with Malta. In the illustration, Hungary’s 13.1-year payback shows how a low retail price weakens the case even with good yield. Commercial projects with lower installed cost per kWp can fare better, and a rising price would improve returns quickly.


Price Components: Energy, Network, and Taxes

Every household bill has three main components: energy and supply, network charges, and taxes and levies. Eurostat’s latest data shows how much the tax part varies.

Eurostat H1 2026 indicator Value
EU household price including taxes €0.2832 per kWh
EU household price excluding taxes €0.2027 per kWh
Taxes and levies, share of EU household price 28.4%
VAT, share of EU household price 15.1% (4.7% in Malta to 21.2% in Hungary)
Highest tax share Poland 46.9%, Germany 34.0%
Lowest tax share Netherlands -9.9%, Malta 5.9%

The Tax Multiplier Effect on Solar ROI

When a solar system offsets one kWh of grid consumption, it avoids the full retail price, including taxes. High-tax markets therefore show a larger saving per self-consumed kWh. In Germany, where taxes and levies are 34.0% of the price, about €0.12 of the €0.3618 per kWh is tax, based on Eurostat’s share. Policy can change that share, and the Danish price drop shows how quickly retail prices can move.

For the cost side of the solar investment, European solar VAT rates vary across markets and affect the upfront price of the system itself.

The Netherlands’ Negative Tax Share

A negative tax share means support measures more than offset the taxes on the bill. That lowers the retail price and the value of each self-consumed kWh. If support falls, prices and solar returns would rise. Check how long the support applies when you model Dutch projects.


Commercial Solar: Different Electricity Price Dynamics

Non-household prices were lower than household prices in H1 2026. Eurostat reports an EU average of €0.1800 per kWh for non-household consumers with annual use between 500 and 2,000 MWh, down 5.4% from H1 2025. That is about 36% below the €0.2832 household average. Ireland had the highest non-household price (€0.2666), followed by Cyprus (€0.2306) and Italy (€0.2253). Finland (€0.0928) and Sweden (€0.1177) were lowest. These business prices exclude refundable taxes and levies.

Despite lower per-kWh prices, commercial solar can match or beat residential returns. Three factors drive that, and each one needs to be checked against the project’s real numbers.

Lower installed cost per kWp. Larger systems spread equipment, installation and engineering cost over more kilowatts, so cost per kWp tends to fall with scale. Use quotes, not averages.

Higher self-consumption. A warehouse, factory or office running on weekdays during daylight often uses a larger share of its solar production on site than a home with occupants at work. More self-consumption means more value at the full commercial tariff.

Tax treatment. Commercial solar is usually a depreciable asset, and many countries offer accelerated depreciation or investment allowances. Check the rules in each country with a tax adviser, because they change and they alter after-tax returns beyond simple payback.

Compare a residential and a commercial tariff side by side

Model the same roof under a household tariff and a business tariff, then compare payback and self-consumption. SurgePV covers shading analysis, energy-yield and financial modeling, and output depends on your inputs.

Book a Demo

Checking cost first? See the SurgePV pricing page.


Self-Consumption Ratio: The Variable That Changes Everything

Of all the inputs in the solar ROI equation, the self-consumption ratio gets the least attention and has the most impact where export compensation is low.

In the German illustration, the gap between the retail price (€0.3618) and the assumed export price (€0.07) is about €0.29 per kWh. For a system producing 5,700 kWh a year, each percentage point of extra self-consumption adds about €17 of annual saving. Raising self-consumption from 30% to 50% adds about €330 a year, with no change in system size or electricity price.

Common ways to raise self-consumption at residential scale:

Smart load shifting. Dishwashers, washing machines and EV charging controlled by solar availability. A 7 kWh EV charge covered entirely by midday solar avoids about €2.53 of grid electricity at the German price (7 kWh × €0.3618).

Heat pump integration. A heat pump scheduled to run during the day moves heating demand into the hours when solar is producing.

Battery storage. A home battery stores midday surplus for the evening, raising the self-consumption share. Whether it pays depends on battery cost, the retail-to-export price gap and cycling, so model it before quoting.

The solar design software used for site assessment should model actual load profiles to find the realistic self-consumption rate before finalizing system size. A generic assumption understates returns for households with EV charging or heat pumps. For country-specific guidance on self-consumption rules, see our post on solar self-consumption rules across Europe.


Export Compensation: How It Shapes System Sizing

Export compensation differs by country, and it changes often. Instead of a table of tariffs that would date quickly, this table shows the main mechanisms and what each means for design. Look up the current rate and rules in each market.

Mechanism How exported energy is paid Design implication Examples to check
Feed-in tariff or premium A set price per exported kWh for a fixed period Export has a predictable value, so larger systems can make sense Germany (EEG), France (Obligation d’Achat)
Net metering Exports offset later consumption, often one for one Export is worth close to the retail price, so size to annual demand The Netherlands until 2027, net metering schemes elsewhere
Net billing or spot-linked buyback Exports are credited at a market-based price Export is worth less than retail, so size to consumption Poland, Spain
Supplier compensation The supplier pays a rate for fed-in power Export is worth less than retail, so size to consumption The Netherlands from 2027

The strategic implication is simple. Where exports earn close to retail value, a larger system can still be defensible. Where exports earn a fraction of retail, match system size to on-site consumption and consider storage.


Projecting Returns in a Volatile Price Environment

Retail electricity prices across Europe have been volatile since the 2022 energy crisis. Eurostat reports that the EU household price excluding taxes peaked at €0.2385 per kWh in H1 2023, then eased to €0.2027 in H1 2026, while prices including taxes have stayed between roughly €0.25 and €0.30 since then.

Renewable generation has also affected wholesale prices. A 2026 analysis covering 19 EU countries reported that renewable expansion reduced average electricity prices by 24.2% between 2023 and 2025. That dynamic, where more solar depresses the wholesale price that export tariffs are sometimes based on, is a feature of high-penetration solar markets.

For a 25-year investment, the price path matters. The tables below reuse the illustration inputs (6 kWp, €8,400, 35% self-consumption, €0.07 export price) and change only the annual real price movement. They ignore degradation, O&M and discounting.

Germany scenario Price assumption Payback (years) 25-year net return (€)
Flat real price €0.3618 throughout 8.6 16,129
Moderate escalation +1.5% a year real 8.2 19,783
High escalation +3% a year real 7.9 24,400
Price decline -1% a year real 8.8 14,120
Spain scenario Price assumption Payback (years) 25-year net return (€)
Flat real price €0.2509 throughout 7.0 21,596
Moderate escalation +1.5% a year real 6.8 25,597
High escalation +3% a year real 6.6 30,653
Price decline -1% a year real 7.1 19,397

Payback barely moves between scenarios because it happens early, when the price path has not compounded. The 25-year return moves a lot more. That is the right lens for escalation: it changes lifetime value more than it changes payback.

Key Takeaway: Hedge Value

Beyond NPV, a solar system gives some protection against future price increases. A customer who produces part of their own power for 25 years is partly hedged against retail price swings. The Danish price fall also shows the reverse risk, so always show the customer a flat and a falling price case next to the optimistic one.


How Incentives Modify the Country Picture

Raw electricity prices set the value side of solar ROI. Incentives such as tax deductions, grants, reduced VAT and green certificates act on the cost side. Programs and rates change often, so the table shows how each type affects payback, and the European solar incentives guide covers country programs.

Incentive type How it works Effect on payback
Upfront grant Reduces the price paid Shortens payback in proportion to the reduction
Tax deduction over several years Returns part of the cost through lower tax Shortens effective payback, but cash arrives later
Reduced VAT Lowers the invoice Shortens payback by the VAT difference
Green certificates or premiums Adds a revenue stream Raises annual benefit
Municipal rebates Local reductions in property or permit taxes Varies by town

A quick way to test any cost-side incentive: in the German illustration, a 20% reduction in net cost moves payback from 8.6 to about 6.8 years (€6,720 ÷ €981). Show the result with and without the incentive, so the customer sees what depends on policy.


Using Solar Software to Model Country-Specific ROI

The data in this article is a market-level framework. Real project ROI depends on site-specific variables: exact irradiance at the address, roof orientation and tilt, shading from adjacent structures, the customer’s load profile and the tariff band they occupy.

Professional solar software should combine:

  • Location-specific irradiance from a calibrated source such as the PVGIS tool from the European Commission’s Joint Research Centre, which offers free and open access to PV potential for different technologies and system configurations
  • Shading analysis to find the real yield reduction, such as SurgePV’s shadow analysis on a 3D roof model
  • Load profile modeling to calculate self-consumption
  • Tariff structures including retail price, export compensation and any prosumer charges
  • Incentive parameters such as deduction schedules, grants and VAT rates

The output is a project-specific payback, NPV and IRR, not a country benchmark. Two houses a few kilometers apart can have very different paybacks depending on roof orientation and daily energy use.

Pro Tip: Site Assessment Before Financial Modeling

A shadow analysis for the specific roof changes the production estimate, and therefore the payback, more than any other single input. In the German illustration, a 20% shading loss stretches payback from 8.6 to about 10.8 years. Do not use generic country yield averages in client proposals without checking trees, neighboring buildings and roof geometry.


Conclusion

Three things determine whether solar ROI in a European market is short or long:

  • Electricity price. In the illustration, a retail price €0.10 per kWh lower adds about two to two and a half years to payback. Use the latest Eurostat half-year, because prices can move sharply in a year.
  • Irradiance. Sun can offset a price disadvantage. In the illustration, Italy and Spain pay back faster than Ireland or Germany despite lower or similar prices.
  • Self-consumption rate. Where export compensation is low, raising self-consumption from 30% to 50% adds about €330 a year in the German illustration without changing the system.

For installers and advisors modeling these returns, use site-specific tools and not country averages, and show flat, rising and falling price cases. Solar returns stay positive across a wide range of plausible price paths, and the analysis is about how fast and how much.

Want to test a European tariff on a real roof? Book a SurgePV demo and bring a customer bill.


Frequently Asked Questions

Which European country has the highest electricity prices?

Ireland had the highest household electricity price in the EU in the first half of 2026 at €0.3871 per kWh, according to Eurostat. Germany (€0.3618) and Belgium (€0.3575) followed. The EU weighted average was €0.2832 per kWh, so Irish households paid 37% above it.

How do electricity prices affect solar payback period in Europe?

Higher retail prices shorten payback because each self-consumed kWh saves the full retail price. In this guide’s illustration, a price €0.10 per kWh lower adds about two to two and a half years to payback. Yield and self-consumption matter as much, so model the specific site and tariff.

Where is solar ROI best in Europe?

ROI is best where reasonable prices meet strong sun and high self-consumption. In this guide’s same-system illustration, Italy and Spain pay back in about 7 years while Ireland and Germany take about 8.6 years, despite higher prices. The inputs are assumptions, so run a site-specific model before quoting.

Why are electricity prices so high in Germany?

German household prices include a large share of taxes and levies. Eurostat reports taxes and levies at 34.0% of the German household price in H1 2026, the second-highest share in the EU after Poland, against an EU average of 28.4%. The rest is energy, supply and network cost.

How does electricity price volatility affect long-term solar ROI projections?

Price volatility moves lifetime returns more than payback. In this guide’s German illustration, payback stays between 7.9 and 8.8 years across escalation and decline cases, while the 25-year net return ranges from about €14,100 to €24,400. Always show flat, rising and falling price scenarios.

Do commercial solar systems have better ROI than residential in Europe?

Not automatically, because business electricity is cheaper per kWh. Eurostat reports an EU non-household average of €0.1800 per kWh in H1 2026 against €0.2832 for households. Commercial projects can still pay back well through lower installed cost per kWp and higher daytime self-consumption, so check each project.

Which European countries had the biggest electricity price changes recently?

Between H1 2025 and H1 2026, Eurostat reports the largest household price increases in Romania (51.9%), Ireland (19.8%) and Finland (18.4%). The largest decreases were in Denmark (31.7%), Luxembourg (24.1%) and Czechia (11.8%). Use the latest half-year data when you model tariffs.

Where this fits

This article is part of SurgePV's Solar Business & Operations hub, which works through the topic from first principles to the decisions a project team actually has to make.

About the Contributors

Author
Akash Hirpara
Akash Hirpara

Co-Founder · SurgePV

Akash Hirpara is identified by SurgePV as a company co-founder. His SurgePV author page lists only role information that can be tied to the public profile below; education, certifications, project totals, financial results, speaking engagements, and media appearances are not asserted without retained evidence.

Editor
Rainer Neumann
Rainer Neumann

Editorial contributor · SurgePV

Rainer Neumann is credited as an editorial contributor on SurgePV content. This profile does not assert engineering credentials, project totals, software-testing experience, education, speaking engagements, or media citations because independent verification evidence is not retained in the publication record.

Get Solar Design Tips in Your Inbox

Join 2,000+ solar professionals. One email per week - no spam.

No spam · Unsubscribe anytime

Book Free Demo

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.