Solar Installers in Wisconsin

Compare published solar company information across Wisconsin, verify credentials directly, and request quotes from local installers.

20 Companies2 Cities0 Reviews

Find Solar Installers by City

Browse 2 cities in Wisconsin. Select a city to see local installers.

All Solar Installers in Wisconsin

20 solar companies across Wisconsin

AE

All Energy Solar

Est. 2009·Madison, Wisconsin·Reported 25yr warranty
SolarDesignBatteryEV Charging

Reported credentials: NABCEP

AS

Arch Solar

Est. 2003·Madison, Wisconsin·Reported 25yr warranty
SolarDesignBatteryMaintenance

Reported credentials: NABCEP · WBE

AS

Arch Solar

Est. 2003·Milwaukee, Wisconsin·Reported 25yr warranty
SolarBatteryDesignEV Charging

Reported credentials: NABCEP · BBB A+ Rating · Solar Power World Top Contractor

Enphase

CE

Current Electric

Est. 1983·Milwaukee, Wisconsin·Reported 25yr warranty
SolarBatteryDesignEV Charging

Reported credentials: NABCEP PV Professional · Focus on Energy Trade Ally · Grow Solar Selected Installer

Enphase

DS

Drews Solar

Est. 2016·Madison, Wisconsin·Reported 25yr warranty
SolarDesignMonitoring
ES

Elevated Solar and Electric

Est. 2021·Milwaukee, Wisconsin·Reported 25yr warranty
SolarBatteryDesignEV Charging

Reported credentials: BBB Accredited · Licensed Electrical Contractor

ES

Everlight Solar

Est. 2018·Madison, Wisconsin·Reported 25yr warranty
SolarDesignBatteryMaintenance

Reported credentials: NABCEP

FS

Full Spectrum Solar

Est. 2002·Madison, Wisconsin·Reported 25yr warranty
SolarDesignBatteryMaintenance

Reported credentials: NABCEP · HVAC Licensed · Electrical Contractor Licensed

SMA

FS

Full Spectrum Solar

Est. 2004·Milwaukee, Wisconsin·Reported 25yr warranty
SolarBatteryDesignMonitoring

Reported credentials: Grow Solar Selected Installer

HS

H&H Solar Energy Services

Est. 2003·Madison, Wisconsin·Reported 25yr warranty
SolarDesignMaintenance
HT

Home Team Energy

Est. 2019·Milwaukee, Wisconsin·Reported 25yr warranty
SolarBatteryDesignMonitoring

Fronius

IB

Integrated Building Systems

Est. 2009·Milwaukee, Wisconsin·Reported 25yr warranty
SolarDesignelectrical_servicesMonitoring

How We Rank Solar Installers

Directory ordering uses currently published profile information such as claimed status, stated experience, services, and warranty fields. Verify all company claims before hiring.

Customer Reviews

Ratings are not republished unless SurgePV can document their source and verification. Check current feedback on the original platform.

Certifications

NABCEP certification is the US gold standard. We also check for state licensing, BBB accreditation, and manufacturer certifications.

Track Record

Published profile fields help users compare companies. These details are not a quality score and must be verified directly.

Why Trust the SurgePV Directory?

Profiles compile available company information for comparison. SurgePV does not guarantee licensing, certification, active-trading status, or service quality. Verify each item directly.

20

Published Profiles

0

Customer Reviews

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Frequently Asked Questions

How much do solar panels cost in Wisconsin?

Solar panel costs in Wisconsin typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. State and local incentives, net metering, and SRECs may help reduce your net cost.

What certifications should I look for?

NABCEP (North American Board of Certified Energy Practitioners) certification is the gold standard. At minimum, your installer should hold the required Wisconsin state contractor license, carry liability insurance and workers' compensation, and have manufacturer certifications for the equipment they install.

What solar incentives are available in Wisconsin?

The 30% federal residential solar tax credit expired on December 31, 2025. Homeowners in Wisconsin can no longer claim this federal credit for new installations. State-level incentives may still be available, including state tax credits, rebates, property tax exemptions, sales tax exemptions, net metering, and SRECs. Commercial projects may still qualify for the federal ITC under transition rules. Check with your installer or visit the DSIRE database for current Wisconsin-specific incentives.

Are You a Solar Installer in Wisconsin?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.