L

Lehmann Electrical & Design in Milwaukee

Milwaukee, Wisconsin·Solar Installation
ResidentialCommercial

6+ yrs

Experience

350+

Projects

80 km

Service radius

11-50

Employees

Profile information

83%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About Lehmann Electrical & Design

Published directory profile for Lehmann Electrical & Design in Milwaukee. Verify services, credentials, ratings, and references directly with their original sources.

Milwaukee, Wisconsin 53226

Milwaukee, Wisconsin 53226

Services Offered

Solar InstallationBattery StorageSolar DesignEV Chargingelectrical_servicesMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

Wisconsin Master ElectricianTesla Certified EV InstallerBBB A+ Rating

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Milwaukee, WisconsinWauwatosa, WisconsinWaukesha, WisconsinBrookfield, WisconsinElm Grove, WisconsinNew Berlin, WisconsinWest Allis, WisconsinGreenfield, WisconsinFranklin, WisconsinOak Creek, Wisconsin

Customer Reviews

No reviews yet. Be the first to review Lehmann Electrical & Design!

Write a Review

Frequently Asked Questions

How do I get a quote from Lehmann Electrical & Design?

You can request a quote through the form on this page or contact Lehmann Electrical & Design directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Lehmann Electrical & Design serve?

Lehmann Electrical & Design is based in Milwaukee and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Lehmann Electrical & Design hold?

This profile lists the following reported certifications: Wisconsin Master Electrician, Tesla Certified EV Installer, BBB A+ Rating. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Lehmann Electrical & Design offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Lehmann Electrical & Design for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Lehmann Electrical & Design for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Lehmann Electrical & Design handle permits and paperwork?

The exact scope is not verified on this profile. Ask Lehmann Electrical & Design which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2020
Employees11-50
Profile StatusUnclaimed
Profile Complete83%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Lehmann Electrical & Design

Send your project details to request follow-up from Lehmann Electrical & Design. Response timing and consultation terms are set by the company.

For Lehmann Electrical & Design

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
L

Lehmann Electrical & Design

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.