H

H&H Solar Energy Services in Madison

Madison, Wisconsin·Solar Installation
ResidentialCommercial

23+ yrs

Experience

80 km

Service radius

2-10

Employees

Profile information

67%
Contact details100%
Company website0%
Business overview100%
Services listed100%
Service area100%
Social profile0%

About H&H Solar Energy Services

Licensed electricians and plumbers installing top-quality solar electric and thermal systems in Madison since 2003

Madison, Wisconsin 53713

Madison, Wisconsin 53713

Services Offered

Solar InstallationSolar DesignMaintenance

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Madison, WisconsinMiddleton, WisconsinSun Prairie, WisconsinFitchburg, WisconsinVerona, Wisconsin

Customer Reviews

No reviews yet. Be the first to review H&H Solar Energy Services!

Write a Review

Frequently Asked Questions

How do I get a quote from H&H Solar Energy Services?

You can request a quote through the form on this page or contact H&H Solar Energy Services directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does H&H Solar Energy Services serve?

H&H Solar Energy Services is based in Madison and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does H&H Solar Energy Services hold?

This profile does not list independently verified certifications. Ask H&H Solar Energy Services for current license, insurance, and credential details, then confirm them with the relevant authority.

What warranty does H&H Solar Energy Services offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask H&H Solar Energy Services for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask H&H Solar Energy Services for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does H&H Solar Energy Services handle permits and paperwork?

The exact scope is not verified on this profile. Ask H&H Solar Energy Services which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2003
Employees2-10
Profile StatusUnclaimed
Profile Complete67%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from H&H Solar Energy Services

Send your project details to request follow-up from H&H Solar Energy Services. Response timing and consultation terms are set by the company.

For H&H Solar Energy Services

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
H

H&H Solar Energy Services

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.