SunVest Solar in Milwaukee
17+ yrs
Experience
1000+
Projects
150 km
Service radius
11-50
Employees
Profile information
About SunVest Solar
Wisconsin-based solar developer ranked among the nation's top 50 solar contractors since 2009
Milwaukee, Wisconsin 53072
Milwaukee, Wisconsin 53072
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review SunVest Solar!
Frequently Asked Questions
How do I get a quote from SunVest Solar?
You can request a quote through the form on this page or contact SunVest Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does SunVest Solar serve?
SunVest Solar is based in Milwaukee and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does SunVest Solar hold?
This profile lists the following reported certifications: BBB Accredited, Solar Power World Top 50, Focus on Energy Trade Ally. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does SunVest Solar offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask SunVest Solar for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask SunVest Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does SunVest Solar handle permits and paperwork?
The exact scope is not verified on this profile. Ask SunVest Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from SunVest Solar
Send your project details to request follow-up from SunVest Solar. Response timing and consultation terms are set by the company.
For SunVest Solar
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
SunVest Solar