F

Full Spectrum Solar in Madison

Madison, Wisconsin·Solar Installation
ResidentialCommercial

24+ yrs

Experience

150 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Full Spectrum Solar

Family-owned solar contractor with NABCEP-certified engineers serving Wisconsin homeowners and businesses for over 20 years

Madison, Wisconsin 53703

Madison, Wisconsin 53703

Services Offered

Solar InstallationSolar DesignBattery StorageMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPHVAC LicensedElectrical Contractor Licensed

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Inverters

SMAFroniusEnphaseGenerac

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Madison, WisconsinWaukesha, WisconsinMilwaukee, WisconsinMiddleton, WisconsinSun Prairie, WisconsinFitchburg, Wisconsin

Customer Reviews

No reviews yet. Be the first to review Full Spectrum Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Full Spectrum Solar?

You can request a quote through the form on this page or contact Full Spectrum Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Full Spectrum Solar serve?

Full Spectrum Solar is based in Madison and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Full Spectrum Solar hold?

This profile lists the following reported certifications: NABCEP, HVAC Licensed, Electrical Contractor Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Full Spectrum Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Full Spectrum Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Full Spectrum Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Full Spectrum Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Full Spectrum Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2002
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Full Spectrum Solar

Send your project details to request follow-up from Full Spectrum Solar. Response timing and consultation terms are set by the company.

For Full Spectrum Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
F

Full Spectrum Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.