A

Arch Solar in Madison

Madison, Wisconsin·Solar Installation
ResidentialCommercial

23+ yrs

Experience

200 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Arch Solar

Women-owned solar contractor with 15 NABCEP-certified professionals and over 20 years of experience in Wisconsin

Madison, Wisconsin 53718

Madison, Wisconsin 53718

Services Offered

Solar InstallationSolar DesignBattery StorageMaintenanceMonitoring

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPWBE

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

12yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Madison, WisconsinMilwaukee, WisconsinPlymouth, WisconsinGreen Bay, WisconsinMiddleton, WisconsinSun Prairie, Wisconsin

Customer Reviews

No reviews yet. Be the first to review Arch Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Arch Solar?

You can request a quote through the form on this page or contact Arch Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Arch Solar serve?

Arch Solar is based in Madison and serves within a 200 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Arch Solar hold?

This profile lists the following reported certifications: NABCEP, WBE. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Arch Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Arch Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Arch Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Arch Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Arch Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2003
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Arch Solar

Send your project details to request follow-up from Arch Solar. Response timing and consultation terms are set by the company.

For Arch Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
A

Arch Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.