Solar Installers in Missouri

Compare published solar company information across Missouri, verify credentials directly, and request quotes from local installers.

20 Companies2 Cities0 Reviews

Find Solar Installers by City

Browse 2 cities in Missouri. Select a city to see local installers.

All Solar Installers in Missouri

20 solar companies across Missouri

8S

816 Solar Pro

Est. 2019·Kansas City, Missouri·Reported 25yr warranty
SolarBatteryDesignEnergy Audit

Reported credentials: BBB Accredited · Enphase Certified

Silfab + Enphase

AS

Astrawatt Solar

Est. 2018·Kansas City, Missouri·Reported 25yr warranty
SolarBatteryDesignEnergy Audit

Reported credentials: BBB Accredited · Inc. 5000 Honoree

BS

Barrett Solar

Est. 2019·Kansas City, Missouri·Reported 25yr warranty
SolarDesignEnergy AuditGrid Connection

Reported credentials: BBB Accredited

BS

BKJ Solar

Est. 2017·St. Louis, Missouri·Reported 25yr warranty
SolarBatteryDesignEnergy Audit

Reported credentials: NABCEP · Enphase Certified · Generac Dealer

SunPower + Enphase

BE

Brda Electric

Est. 1989·St. Louis, Missouri·Reported 25yr warranty
SolarDesignMaintenanceGrid Connection

Reported credentials: Licensed Electrical Contractor · BBB Accredited

B

Brightergy

Est. 2010·Kansas City, Missouri·Reported 25yr warranty
SolarDesignEnergy AuditMaintenance

Reported credentials: BBB Accredited · LEED Certified HQ

EE

EFS Energy

Est. 2011·St. Louis, Missouri·Reported 25yr warranty
SolarBatteryDesignEnergy Audit

Reported credentials: NABCEP · MOSEIA Member · USGBC Member · ISEA Member

Silfab + Enphase

EE

Exceptional Energy Solutions

Est. 2015·St. Louis, Missouri·Reported 25yr warranty
SolarDesignEnergy AuditGrid Connection

Reported credentials: NABCEP · Ameren Trade Ally Partner

HG

Helio GreenTech

Est. 2019·Kansas City, Missouri·Reported 25yr warranty
SolarBatteryDesignEnergy Audit

Reported credentials: NABCEP · BBB Accredited

VSUN + Enphase

JE

JK Exteriors

Est. 2001·St. Louis, Missouri·Reported 25yr warranty
SolarDesignRoof AssessmentEnergy Audit

Reported credentials: BBB A+

KE

KC Energy Solar

Est. 2018·Kansas City, Missouri·Reported 25yr warranty
SolarDesignEnergy AuditGrid Connection

Reported credentials: BBB Accredited

MP

MC Power Companies

Est. 2010·Kansas City, Missouri·Reported 25yr warranty
SolarBatteryDesignEnergy Audit

Reported credentials: NABCEP · SEIA Member · Top Solar Contractor (Solar Power World)

How We Rank Solar Installers

Directory ordering uses currently published profile information such as claimed status, stated experience, services, and warranty fields. Verify all company claims before hiring.

Customer Reviews

Ratings are not republished unless SurgePV can document their source and verification. Check current feedback on the original platform.

Certifications

NABCEP certification is the US gold standard. We also check for state licensing, BBB accreditation, and manufacturer certifications.

Track Record

Published profile fields help users compare companies. These details are not a quality score and must be verified directly.

Why Trust the SurgePV Directory?

Profiles compile available company information for comparison. SurgePV does not guarantee licensing, certification, active-trading status, or service quality. Verify each item directly.

20

Published Profiles

0

Customer Reviews

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Frequently Asked Questions

How much do solar panels cost in Missouri?

Solar panel costs in Missouri typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. State and local incentives, net metering, and SRECs may help reduce your net cost.

What certifications should I look for?

NABCEP (North American Board of Certified Energy Practitioners) certification is the gold standard. At minimum, your installer should hold the required Missouri state contractor license, carry liability insurance and workers' compensation, and have manufacturer certifications for the equipment they install.

What solar incentives are available in Missouri?

The 30% federal residential solar tax credit expired on December 31, 2025. Homeowners in Missouri can no longer claim this federal credit for new installations. State-level incentives may still be available, including state tax credits, rebates, property tax exemptions, sales tax exemptions, net metering, and SRECs. Commercial projects may still qualify for the federal ITC under transition rules. Check with your installer or visit the DSIRE database for current Missouri-specific incentives.

Are You a Solar Installer in Missouri?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.