S

Solar City STL in St. Louis

St. Louis, Missouri·Solar Installation
Residential

5+ yrs

Experience

100 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Solar City STL

NABCEP-certified St. Louis solar installer specializing in American-made panels with Enphase Gold Certified status

St. Louis, Missouri 63123

St. Louis, Missouri 63123

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPEnphase Gold CertifiedSilfab CertifiedIronRidge CertifiedAmeren Fast-Track Installer

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SilfabSolaria

Inverters

Enphase

Batteries

Enphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

St. Louis, MissouriAffton, MissouriMehlville, MissouriWebster Groves, MissouriKirkwood, MissouriFenton, MissouriArnold, Missouri

Customer Reviews

No reviews yet. Be the first to review Solar City STL!

Write a Review

Frequently Asked Questions

How do I get a quote from Solar City STL?

You can request a quote through the form on this page or contact Solar City STL directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Solar City STL serve?

Solar City STL is based in St. Louis and serves within a 100 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Solar City STL hold?

This profile lists the following reported certifications: NABCEP, Enphase Gold Certified, Silfab Certified, IronRidge Certified, Ameren Fast-Track Installer. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Solar City STL offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Solar City STL for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Solar City STL for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Solar City STL handle permits and paperwork?

The exact scope is not verified on this profile. Ask Solar City STL which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2021
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Solar City STL

Send your project details to request follow-up from Solar City STL. Response timing and consultation terms are set by the company.

For Solar City STL

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Solar City STL

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.