MC Power Companies in Kansas City
16+ yrs
Experience
300 km
Service radius
51-200
Employees
Profile information
About MC Power Companies
Kansas City solar and electrical contractor since 2010 with over 90 MW installed and seven consecutive Top Solar Contractor awards
Kansas City, Missouri 64086
Kansas City, Missouri 64086
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review MC Power Companies!
Frequently Asked Questions
How do I get a quote from MC Power Companies?
You can request a quote through the form on this page or contact MC Power Companies directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does MC Power Companies serve?
MC Power Companies is based in Kansas City and serves within a 300 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does MC Power Companies hold?
This profile lists the following reported certifications: NABCEP, SEIA Member, Top Solar Contractor (Solar Power World). SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does MC Power Companies offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask MC Power Companies for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask MC Power Companies for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does MC Power Companies handle permits and paperwork?
The exact scope is not verified on this profile. Ask MC Power Companies which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from MC Power Companies
Send your project details to request follow-up from MC Power Companies. Response timing and consultation terms are set by the company.
For MC Power Companies
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
MC Power Companies