SolaTrue St. Louis in St. Louis
6+ yrs
Experience
120 km
Service radius
1-10
Employees
Profile information
About SolaTrue St. Louis
Locally owned solar franchise in Pacific, MO serving the greater St. Louis area with Enphase-backed residential installations
St. Louis, Missouri 63069
St. Louis, Missouri 63069
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Equipment Brands
Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.
Inverters
Batteries
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
25yr
Inverter Warranty
25yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review SolaTrue St. Louis!
Frequently Asked Questions
How do I get a quote from SolaTrue St. Louis?
You can request a quote through the form on this page or contact SolaTrue St. Louis directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does SolaTrue St. Louis serve?
SolaTrue St. Louis is based in St. Louis and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does SolaTrue St. Louis hold?
This profile lists the following reported certifications: BBB Accredited, Enphase Certified. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does SolaTrue St. Louis offer?
This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask SolaTrue St. Louis for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask SolaTrue St. Louis for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does SolaTrue St. Louis handle permits and paperwork?
The exact scope is not verified on this profile. Ask SolaTrue St. Louis which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Business Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from SolaTrue St. Louis
Send your project details to request follow-up from SolaTrue St. Louis. Response timing and consultation terms are set by the company.
For SolaTrue St. Louis
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
SolaTrue St. Louis