S

StraightUp Solar in St. Louis

St. Louis, Missouri·Solar Installation
ResidentialCommercial

20+ yrs

Experience

3000+

Projects

160 km

Service radius

51-200

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About StraightUp Solar

Certified B Corp solar installer serving St. Louis since 2006, with over 3,000 systems installed and NABCEP-certified team

St. Louis, Missouri 63146

St. Louis, Missouri 63146

Services Offered

Solar InstallationBattery StorageMaintenanceMonitoringSolar DesignEnergy AuditGrid Connection

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPCertified B CorpBBB A+

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

SilfabREC

Inverters

Enphase

Batteries

Tesla PowerwallEnphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

St. Louis, MissouriMaryland Heights, MissouriSt. Charles, MissouriChesterfield, MissouriEdwardsville, MissouriBelleville, MissouriColumbia, Missouri

Customer Reviews

No reviews yet. Be the first to review StraightUp Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from StraightUp Solar?

You can request a quote through the form on this page or contact StraightUp Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does StraightUp Solar serve?

StraightUp Solar is based in St. Louis and serves within a 160 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does StraightUp Solar hold?

This profile lists the following reported certifications: NABCEP, Certified B Corp, BBB A+. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does StraightUp Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask StraightUp Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask StraightUp Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does StraightUp Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask StraightUp Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2006
Employees51-200
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from StraightUp Solar

Send your project details to request follow-up from StraightUp Solar. Response timing and consultation terms are set by the company.

For StraightUp Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

StraightUp Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.