E

EFS Energy in St. Louis

St. Louis, Missouri·Solar Installation
ResidentialCommercialIndustrial

15+ yrs

Experience

2000+

Projects

160 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About EFS Energy

NABCEP-certified St. Louis solar installer since 2011, specializing in residential, commercial, and agricultural systems with over 2,000 installations

St. Louis, Missouri 63118

St. Louis, Missouri 63118

Services Offered

Solar InstallationBattery StorageSolar DesignEnergy AuditGrid ConnectionMaintenance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPMOSEIA MemberUSGBC MemberISEA Member

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

Silfab

Inverters

EnphaseSMA

Batteries

Enphase IQ Battery

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

St. Louis, MissouriJefferson City, MissouriCape Girardeau, MissouriEdwardsville, MissouriBelleville, MissouriSpringfield, Missouri

Customer Reviews

No reviews yet. Be the first to review EFS Energy!

Write a Review

Frequently Asked Questions

How do I get a quote from EFS Energy?

You can request a quote through the form on this page or contact EFS Energy directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does EFS Energy serve?

EFS Energy is based in St. Louis and serves within a 160 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does EFS Energy hold?

This profile lists the following reported certifications: NABCEP, MOSEIA Member, USGBC Member, ISEA Member. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does EFS Energy offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask EFS Energy for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask EFS Energy for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does EFS Energy handle permits and paperwork?

The exact scope is not verified on this profile. Ask EFS Energy which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2011
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from EFS Energy

Send your project details to request follow-up from EFS Energy. Response timing and consultation terms are set by the company.

For EFS Energy

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
E

EFS Energy

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.