Solar Installers in Virginia

Compare published solar company information across Virginia, verify credentials directly, and request quotes from local installers.

23 Companies3 Cities0 Reviews

Find Solar Installers by City

Browse 3 cities in Virginia. Select a city to see local installers.

All Solar Installers in Virginia

23 solar companies across Virginia

CP

Commonwealth Power

Est. 2013·Richmond, Virginia·Reported 25yr warranty
SolarDesignEnergy AuditEV Charging

Reported credentials: NABCEP

CS

Convert Solar

Est. 2010·Richmond, Virginia·Reported 25yr warranty
SolarDesignBatteryMaintenance

Reported credentials: NABCEP · Class A Contractor (VA)

REC + SolarEdge

CS

Convert Solar

Est. 2012·Virginia Beach, Virginia·Reported 25yr warranty
SolarDesignBatteryMaintenance

Reported credentials: NABCEP Certified · BBB A+ Rating · Virginia Class A Licensed

E

ElectriPros

Est. 2016·Virginia Beach, Virginia·Reported 25yr warranty
SolarDesignBatteryMaintenance

Reported credentials: BBB A+ Rating · Virginia Class A Solar Certified

GE

Gault Electric

Est. 1988·Norfolk, Virginia·Reported 25yr warranty
SolarMaintenanceDesign

Reported credentials: BBB Accredited · NABCEP Certified

KH

Kilo Hollow Energy

Est. 2020·Richmond, Virginia·Reported 25yr warranty
SolarDesignBatteryground_mount

Reported credentials: BBB Accredited · Licensed Contractor (VA)

LE

LightSkye Energy

Est. 2020·Richmond, Virginia·Reported 25yr warranty
SolarDesignBatteryMaintenance
NS

NCI Solar Group

Est. 1994·Richmond, Virginia·Reported 25yr warranty
SolarDesignEnergy AuditMaintenance

Reported credentials: NABCEP

RH

Radiant Home Services

Est. 2019·Richmond, Virginia·Reported 25yr warranty
SolarDesignBatteryRoof Assessment

Reported credentials: Class A Contractor · BBB Accredited

RE

Renew Energy

Est. 2014·Virginia Beach, Virginia·Reported 25yr warranty
SolarDesignBatteryfinancing_assistance

Reported credentials: BBB A+ Rating · BBB Accredited

SS

Shockoe Solar

Est. 2018·Richmond, Virginia·Reported 25yr warranty
SolarDesignMaintenanceGrid Connection

Reported credentials: Licensed Contractor (VA) · Licensed Contractor (NC)

Enphase

SP

Solar Panels Virginia Beach

Virginia Beach, Virginia·Reported 25yr warranty
SolarDesignEnergy AuditMaintenance

Reported credentials: NABCEP Certified

How We Rank Solar Installers

Directory ordering uses currently published profile information such as claimed status, stated experience, services, and warranty fields. Verify all company claims before hiring.

Customer Reviews

Ratings are not republished unless SurgePV can document their source and verification. Check current feedback on the original platform.

Certifications

NABCEP certification is the US gold standard. We also check for state licensing, BBB accreditation, and manufacturer certifications.

Track Record

Published profile fields help users compare companies. These details are not a quality score and must be verified directly.

Why Trust the SurgePV Directory?

Profiles compile available company information for comparison. SurgePV does not guarantee licensing, certification, active-trading status, or service quality. Verify each item directly.

23

Published Profiles

0

Customer Reviews

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the US. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Frequently Asked Questions

How much do solar panels cost in Virginia?

Solar panel costs in Virginia typically range from $2.50-$3.50 per watt. A standard 8kW residential system costs $20,000-$28,000. The 30% federal residential tax credit expired on December 31, 2025, so this is the full out-of-pocket cost. State and local incentives, net metering, and SRECs may help reduce your net cost.

What certifications should I look for?

NABCEP (North American Board of Certified Energy Practitioners) certification is the gold standard. At minimum, your installer should hold the required Virginia state contractor license, carry liability insurance and workers' compensation, and have manufacturer certifications for the equipment they install.

What solar incentives are available in Virginia?

The 30% federal residential solar tax credit expired on December 31, 2025. Homeowners in Virginia can no longer claim this federal credit for new installations. State-level incentives may still be available, including state tax credits, rebates, property tax exemptions, sales tax exemptions, net metering, and SRECs. Commercial projects may still qualify for the federal ITC under transition rules. Check with your installer or visit the DSIRE database for current Virginia-specific incentives.

Are You a Solar Installer in Virginia?

List your company for free and connect with local customers looking for solar installation services.

List Your Company Free

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.