C

Convert Solar in Virginia Beach

Virginia Beach, Virginia·Solar Installation
ResidentialCommercial

14+ yrs

Experience

7000+

Projects

120 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Convert Solar

NABCEP certified Class A solar contractor in Virginia Beach providing turnkey residential and commercial solar solutions since 2012

Virginia Beach, Virginia 23455

Virginia Beach, Virginia 23455

Services Offered

Solar InstallationSolar DesignBattery StorageMaintenanceRoof Assessmentpermitting

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP CertifiedBBB A+ RatingVirginia Class A Licensed

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Virginia Beach, VirginiaNorfolk, VirginiaChesapeake, VirginiaHampton, VirginiaNewport News, VirginiaSuffolk, VirginiaWilliamsburg, VirginiaPortsmouth, Virginia

Customer Reviews

No reviews yet. Be the first to review Convert Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Convert Solar?

You can request a quote through the form on this page or contact Convert Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Convert Solar serve?

Convert Solar is based in Virginia Beach and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Convert Solar hold?

This profile lists the following reported certifications: NABCEP Certified, BBB A+ Rating, Virginia Class A Licensed. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Convert Solar offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Convert Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Convert Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Convert Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Convert Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2012
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Convert Solar

Send your project details to request follow-up from Convert Solar. Response timing and consultation terms are set by the company.

For Convert Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
C

Convert Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.