S

Sunbum Solar & Roofing in Virginia Beach

Virginia Beach, Virginia·Solar Installation
Residential

21+ yrs

Experience

150 km

Service radius

11-50

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Sunbum Solar & Roofing

Published directory profile for Sunbum Solar & Roofing in Virginia Beach. Verify services, credentials, ratings, and references directly with their original sources.

Virginia Beach, Virginia 23462

Virginia Beach, Virginia 23462

Services Offered

Solar InstallationSolar DesignBattery StorageRoof Assessmentfinancing_assistance

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEP CertifiedBBB A+ Rating

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

10yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Virginia Beach, VirginiaNorfolk, VirginiaChesapeake, VirginiaSuffolk, VirginiaHampton, VirginiaNewport News, Virginia

Customer Reviews

No reviews yet. Be the first to review Sunbum Solar & Roofing!

Write a Review

Frequently Asked Questions

How do I get a quote from Sunbum Solar & Roofing?

You can request a quote through the form on this page or contact Sunbum Solar & Roofing directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Sunbum Solar & Roofing serve?

Sunbum Solar & Roofing is based in Virginia Beach and serves within a 150 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Sunbum Solar & Roofing hold?

This profile lists the following reported certifications: NABCEP Certified, BBB A+ Rating. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Sunbum Solar & Roofing offer?

This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Sunbum Solar & Roofing for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Sunbum Solar & Roofing for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Sunbum Solar & Roofing handle permits and paperwork?

The exact scope is not verified on this profile. Ask Sunbum Solar & Roofing which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Contact Information

Social Media

Request a Quote

Business Details

Founded2005
Employees11-50
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Sunbum Solar & Roofing

Send your project details to request follow-up from Sunbum Solar & Roofing. Response timing and consultation terms are set by the company.

For Sunbum Solar & Roofing

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Sunbum Solar & Roofing

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.