Solar Services Inc in Norfolk
40+ yrs
Experience
80 km
Service radius
11-50
Employees
Profile information
About Solar Services Inc
Virginia Beach solar specialist since 1986 providing installations, repairs, and maintenance with nearly 40 years of experience
Norfolk, Virginia 23452
Norfolk, Virginia 23452
Services Offered
Reported Certifications
These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.
Reported Warranty Coverage
Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.
25yr
Panel Warranty
12yr
Inverter Warranty
10yr
Installation Warranty
Installation Process
Initial Consultation
Free site assessment and energy needs analysis
System Design
Custom solar design tailored to your property and budget
Permitting & Approval
All paperwork and utility interconnection handled
Installation
Professional installation by certified technicians
Commissioning & Handover
System testing, monitoring setup, and warranty registration
Service Areas
Customer Reviews
No reviews yet. Be the first to review Solar Services Inc!
Frequently Asked Questions
How do I get a quote from Solar Services Inc?
You can request a quote through the form on this page or contact Solar Services Inc directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.
What areas does Solar Services Inc serve?
Solar Services Inc is based in Norfolk and serves within a 80 km radius. Check the Service Areas section above for a complete list of locations.
What certifications does Solar Services Inc hold?
This profile lists the following reported certifications: BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.
What warranty does Solar Services Inc offer?
This profile reports 25-year panel coverage and 10-year workmanship coverage. Ask Solar Services Inc for current written terms and exclusions.
How long does installation take?
The timeline is project- and jurisdiction-specific. Ask Solar Services Inc for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.
Does Solar Services Inc handle permits and paperwork?
The exact scope is not verified on this profile. Ask Solar Services Inc which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.
Contact Information
Request a QuoteBusiness Details
About this profile
The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.
Request a Quote from Solar Services Inc
Send your project details to request follow-up from Solar Services Inc. Response timing and consultation terms are set by the company.
For Solar Services Inc
Claim Your Free Profile
Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.
Solar Services Inc