S

Southern Exposure Solar in Richmond

Richmond, Virginia·Solar Installation
Residential

7+ yrs

Experience

120 km

Service radius

2-10

Employees

Profile information

100%
Contact details100%
Company website100%
Business overview100%
Services listed100%
Service area100%
Social profile100%

About Southern Exposure Solar

Locally owned Richmond solar installer with NABCEP-certified team, employee-only crews, and CertainTeed 25-year warranty

Richmond, Virginia 23005

Richmond, Virginia 23005

Services Offered

Solar InstallationSolar DesignMaintenancefinancing_assistanceRoof Assessment

Reported Certifications

These credentials are listed on the profile and are not independently verified by SurgePV. Confirm current status with each issuing organization.

NABCEPCertainTeed Master Solar InstallerBBB Accredited

Reported Equipment Brands

Brand relationships and current product availability should be confirmed directly with the installer and manufacturer.

Panels

CertainTeed

Inverters

Enphase

Reported Warranty Coverage

Terms, eligibility, providers, exclusions, and current coverage may vary. Request the written warranty before purchase.

25yr

Panel Warranty

25yr

Inverter Warranty

25yr

Installation Warranty

Installation Process

1

Initial Consultation

Free site assessment and energy needs analysis

2

System Design

Custom solar design tailored to your property and budget

3

Permitting & Approval

All paperwork and utility interconnection handled

4

Installation

Professional installation by certified technicians

5

Commissioning & Handover

System testing, monitoring setup, and warranty registration

Service Areas

Richmond, VirginiaAshland, VirginiaGlen Allen, VirginiaMechanicsville, VirginiaHenrico, VirginiaChesterfield, VirginiaMidlothian, Virginia

Customer Reviews

No reviews yet. Be the first to review Southern Exposure Solar!

Write a Review

Frequently Asked Questions

How do I get a quote from Southern Exposure Solar?

You can request a quote through the form on this page or contact Southern Exposure Solar directly by phone or email. Confirm consultation fees, site-assessment scope, and response times with the company.

What areas does Southern Exposure Solar serve?

Southern Exposure Solar is based in Richmond and serves within a 120 km radius. Check the Service Areas section above for a complete list of locations.

What certifications does Southern Exposure Solar hold?

This profile lists the following reported certifications: NABCEP, CertainTeed Master Solar Installer, BBB Accredited. SurgePV has not independently verified their current status. Confirm each credential with its issuing organization.

What warranty does Southern Exposure Solar offer?

This profile reports 25-year panel coverage and 25-year workmanship coverage. Ask Southern Exposure Solar for current written terms and exclusions.

How long does installation take?

The timeline is project- and jurisdiction-specific. Ask Southern Exposure Solar for separate estimates covering design, permits, procurement, installation, inspection, interconnection, and activation.

Does Southern Exposure Solar handle permits and paperwork?

The exact scope is not verified on this profile. Ask Southern Exposure Solar which permits, utility interconnection filings, inspections, and incentive documents are included in its proposal.

Business Details

Founded2019
Employees2-10
Profile StatusUnclaimed
Profile Complete100%

About this profile

The profile-information percentage measures how many directory fields are present. It is not a quality, trust, licensing, or performance rating. Confirm credentials, insurance, warranties, and references directly before hiring.

Request a Quote from Southern Exposure Solar

Send your project details to request follow-up from Southern Exposure Solar. Response timing and consultation terms are set by the company.

For Southern Exposure Solar

Claim Your Free Profile

Take control of your company profile, respond to reviews, update your information, and receive qualified leads from homeowners in your area.

Claim Profile Free
S

Southern Exposure Solar

Request a Quote

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.