Solar Installers in the United Kingdom

Compare published solar company information across England, Scotland, Wales, and Northern Ireland, verify MCS credentials directly, and request quotes.

503 Companies50 Cities0 Reviews

UK Solar Energy: Market Overview

16.6 GW

Installed Capacity

1.3M+

Solar Installations

70 GW

2035 Target

0% VAT

On Residential Solar

The UK Solar Market in 2026

The UK has over 16.6 GW of installed solar capacity spread across more than 1.3 million installations. Despite its reputation for cloudy weather, the UK receives enough solar irradiance to make residential and commercial solar systems financially viable in every region. Southern England receives around 1,100 kWh/m² per year, while Scotland and Northern England still receive 900–1,000 kWh/m².

The government's target of 70 GW of solar capacity by 2035 - more than four times current capacity - signals strong long-term demand for qualified installers. The solar industry employs over 12,000 people and is growing at roughly 15% per year.

Since April 2022, residential solar installations are VAT-exempt at 0%, reducing the upfront cost of a typical 4kW system to between £5,000 and £8,000. Payback periods now sit between 6 and 8 years depending on location, energy usage, and export rates.

Key Incentives and Policies

Smart Export Guarantee (SEG)

Licensed energy suppliers must pay households for surplus electricity exported to the grid. Rates range from 4–6p/kWh, with some suppliers offering fixed rates above 12p/kWh. Your system must be MCS-certified to qualify.

0% VAT on Solar

Since April 2022, homeowners pay zero VAT on solar panel and battery storage installations. This applies to all domestic properties across the UK and saves roughly £1,000–£1,500 on a typical system.

ECO4 Scheme

The Energy Company Obligation (ECO4) provides free or subsidised solar panels to low-income households. Eligibility is based on property EPC rating and household income.

Permitted Development

Most domestic solar installations don't require planning permission under permitted development rights. Exceptions include listed buildings, conservation areas, and panels protruding more than 200mm from the roof.

Solar Installers by Region

The UK solar market is active across all regions. Here's how our directory breaks down by area.

Solar Panel Costs and Returns in the UK

Typical costs and expected returns for residential and commercial solar panel systems in the UK (2026 data).

System SizeTypical CostAnnual GenerationAnnual SavingsPayback Period
3 kW (small home)£4,000 – £6,0002,500 – 3,000 kWh£500 – £7007 – 9 years
4 kW (avg home)£5,000 – £8,0003,400 – 4,000 kWh£700 – £9506 – 8 years
6 kW (large home)£7,000 – £11,0005,100 – 6,000 kWh£1,000 – £1,4006 – 8 years
10 kW (small commercial)£10,000 – £16,0008,500 – 10,000 kWh£1,700 – £2,4005 – 7 years
50 kW (commercial)£35,000 – £55,00042,500 – 50,000 kWh£8,500 – £12,0004 – 6 years

Savings assume 24p/kWh electricity cost and 50% self-consumption. Actual returns vary by location, roof orientation, and energy usage.

All Solar Installers

503 solar companies across the United Kingdom

2S

2020 Solar PV

Est. 2010·Worcester·Reported 25yr warranty
SolarBattery

Reported credentials: MCS · RECC

2D

21 Degrees (York)

Est. 2003·York·Reported 25yr warranty
SolarBatteryEV ChargingMaintenance

Reported credentials: MCS · RECC · NICEIC · TrustMark

3E

365 Energy Ltd

Exeter·Reported 25yr warranty
SolarBatteryEV ChargingMaintenance

Reported credentials: MCS · TrustATrader

3N

3S Northampton Ltd

Northampton·Reported 25yr warranty
SolarMaintenance

Reported credentials: MCS

AL

A. Lloyd Electrical & Solar

Swansea·Reported 25yr warranty
SolarBatteryMaintenance

Reported credentials: MCS · NICEIC · RECC · TrustMark

AG

A1 Group Edinburgh

Est. 2004·Edinburgh·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: MCS · NICEIC

AS

Aberdeen Solar

Aberdeen·Reported 25yr warranty
SolarMaintenance

Reported credentials: MCS · NICEIC

A

Absolar

Est. 2018·Bournemouth·Reported 25yr warranty
SolarMonitoringEnergy Audit

Reported credentials: MCS

AE

Absolute Electrical Lincoln

Lincoln·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: NICEIC · MCS

AR

ACC Renewable Energy

Est. 2020·Liverpool·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: MCS · RECC · TrustMark · OZEV

AS

Ace Solar Energy

Est. 2010·Wolverhampton·Reported 10yr warranty
SolarBatteryEV ChargingMaintenance

Reported credentials: MCS · Solar Trade Association

AE

Acorn Electrical & Mechanical

Plymouth·Reported 25yr warranty
SolarBattery

Reported credentials: MCS

AI

ACRS Installations

Worcester·Reported 25yr warranty
SolarBattery

Reported credentials: MCS

AS

ACS Solar

Est. 2008·Norwich·Reported 25yr warranty
SolarBatteryEV ChargingMaintenance

Reported credentials: MCS

A

Actismart

Est. 2023·Wolverhampton·Reported 10yr warranty
SolarBatteryEV ChargingMaintenance

Reported credentials: MCS · RECC · TrustMark

AR

Adept Renewables

Est. 2010·Bournemouth·Reported 25yr warranty
SolarBatteryEV ChargingMaintenance

Reported credentials: MCS · HIES · NAPIT

Jinko Solar

AS

AEC Solar Division

Est. 2008·York·Reported 25yr warranty
SolarBatteryMaintenance

Reported credentials: MCS · NAPIT · RECC

AS

AES Solar

Est. 1979·Edinburgh·Reported 25yr warranty
SolarBatteryMaintenance

Reported credentials: MCS · RECC · Queen's Award for Enterprise

AE

Aissac Electrical & Solar

Est. 2006·Aberdeen·Reported 25yr warranty
SolarEV ChargingMaintenance
AT

AJ Taylor Electrical Contractors

Est. 1983·Brighton
SolarBatteryEV ChargingMaintenance

Reported credentials: MCS · NICEIC · Tesla Certified

AS

AK Systems

Gloucester·Reported 25yr warranty
SolarBatteryMaintenance

Reported credentials: MCS · FGAS

AH

Alba Heat and Power

Est. 2010·Edinburgh·Reported 25yr warranty
SolarBattery

Reported credentials: MCS · RECC · TrustMark

AP

All Powered Up

Exeter·Reported 25yr warranty
SolarBatteryEV ChargingMaintenance

Reported credentials: MCS

AS

All Seasons Energy

Est. 2017·Sheffield·Reported 25yr warranty
SolarBatteryEV ChargingEnergy Audit

Reported credentials: MCS · NAPIT · TrustMark · NICEIC

AE

Alps Electrical

York·Reported 25yr warranty
SolarBatteryMaintenance

Reported credentials: MCS · RECC · NAPIT

AE

ALPS Electrical

Est. 2022·Newcastle·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: MCS · RECC · NICEIC

AE

Applegarth Engineering

Est. 2010·Liverpool·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: MCS

AP

AR Power

Est. 2011·Newcastle·Reported 25yr warranty
SolarBatteryMaintenanceEnergy Audit

Reported credentials: MCS · ISO 9001 · ISO 14001 · ISO 45001

AI

Arctic Improvements

Est. 2022·Glasgow·Reported 25yr warranty
SolarBattery

Reported credentials: MCS · RECC · TrustMark

AS

ARD Solar Energy

Cheltenham·Reported 25yr warranty
SolarBatteryMaintenance

Reported credentials: MCS

AS

ARD Solar Energy

Gloucester·Reported 25yr warranty
SolarMaintenance

Reported credentials: MCS · NAPIT · REAL

AG

Aspire Green

Peterborough·Reported 25yr warranty
SolarBatteryEV ChargingMaintenance

Reported credentials: MCS

AR

Atlantic Renewables

Est. 2011·Manchester·Reported 25yr warranty
SolarBatteryEV ChargingMaintenance

Reported credentials: MCS

AL

AuroraPV Ltd

Est. 2011·Luton·Reported 25yr warranty
SolarBattery

Reported credentials: MCS

BS

B Solar Energy

Colchester·Reported 25yr warranty
SolarBatteryEV ChargingMaintenance

Reported credentials: MCS

BS

B Solar Energy

Basildon·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: MCS · NICEIC

BA

Baird and Brown Ltd

Maidstone·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: MCS · RECC · NICEIC

BS

Bath Solar Panel Installation

Bath·Reported 25yr warranty
SolarBatteryMaintenance

Reported credentials: MCS · RECC

B

BeeSOLAR

Belfast·Reported 25yr warranty
SolarBatteryMaintenanceMonitoring

Reported credentials: MCS · RECC

Aiko + SolaX

BE

Bell Electrical & Renewables

Est. 2018·Aberdeen·Reported 25yr warranty
SolarBatteryEV ChargingMaintenance

Reported credentials: MCS

BE

BJC Electrical & Solar

Est. 2015·Peterborough·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: MCS

BE

Bliss Eco Energy

Colchester·Reported 25yr warranty
SolarBatteryEV ChargingMaintenance

Reported credentials: MCS · NAPIT · HIES · TrustMark

BT

Blue Tech Electrical

Peterborough·Reported 25yr warranty
SolarBatteryEV Charging

Reported credentials: MCS · HIES · NAPIT

BE

BlueBuild Energy

Est. 2011·Belfast·Reported 25yr warranty
SolarBatteryMaintenance

Reported credentials: MCS · RECC · ISO 9001 · ISO 14001

BR

Bournemouth Renewables

Bournemouth·Reported 25yr warranty
SolarBatteryMaintenance

Reported credentials: MCS · RECC

BE

Bright Electrical Engineering

Est. 2004·Leicester
SolarBatteryEV ChargingMaintenance

Reported credentials: MCS · NAPIT · RECC · TrustMark

BS

Bright Spark Energy

Est. 2019·Portsmouth
SolarBatteryEV ChargingMonitoring

Reported credentials: MCS · NAPIT · TrustMark

BR

Brookfield Renewable Energies

Est. 2016·Sheffield·Reported 25yr warranty
SolarBatteryMaintenanceMonitoring

Reported credentials: MCS · NICEIC · HIES

How We Rank Solar Installers

Directory ordering uses currently published profile information such as claimed status, stated experience, services, and warranty fields. Featured placement is shown separately. Verify all claims before hiring.

Customer Reviews

Ratings are not republished unless SurgePV can document their source and verification. Check current feedback on the original platform.

Certifications

MCS certification is the UK standard. We also check for RECC, TrustMark, NAPIT, NICEIC, and ISO 9001 accreditations.

Track Record

Published profile fields help users compare companies. These details are not a quality score and must be verified directly.

Why Trust the SurgePV Directory?

Profiles compile available company information for comparison. SurgePV does not guarantee MCS status, active-trading status, or service quality. Confirm details with MCS, Companies House, and the installer.

503

Published Profiles

0

Customer Reviews

How to Choose a Solar Installer in the UK

1

Check MCS Certification

MCS certification is non-negotiable. Without it, you can't access the Smart Export Guarantee or any government-backed financing. Verify the installer's MCS number on the official register at mcscertified.com.

2

Get Multiple Quotes

Get at least three quotes from different installers. Prices for the same system size can vary by 30–40%. A good quote includes a full breakdown of panels, inverter, labour, scaffolding, and any additional work like roof reinforcement.

3

Read Independent Reviews

Check feedback on its original platform and ask for recent project references. Look for consistent patterns, but confirm dates, identity signals, and dispute context before relying on a review.

4

Ask About Warranties

A reputable installer offers separate warranties for panels (25 years), inverter (10–15 years), and workmanship (5–10 years). Be wary of companies offering unusually short installation warranties or vague terms.

5

Verify Insurance and Aftercare

Confirm the installer carries public liability insurance and offers ongoing maintenance. Ask whether they handle DNO notifications and MCS registration on your behalf - most reputable companies do.

For Solar Installers

Design Faster. Sell More.

SurgePV is the solar design platform used by installers across the UK. Cut design time by 60%, generate professional proposals in minutes, and close more deals.

Solar Installation in the UK: Step by Step

1

Free Consultation

Contact an installer for a free site survey. They'll assess your roof, shading, and energy usage.

2

Design & Quote

Receive a detailed proposal with system size, expected generation, costs, and projected savings.

3

Installation

Scaffolding goes up, panels and inverter are installed. Most residential systems take 1–3 days.

4

Inspection

Building control sign-off, DNO notification, and MCS certificate issued for SEG eligibility.

5

Go Live

System is commissioned, monitoring is set up, and you start generating clean energy and saving money.

Frequently Asked Questions

How much do solar panels cost in the UK?

A typical 4kW residential solar panel system in the UK costs between £5,000 and £8,000 including installation. Larger systems for commercial properties range from £10,000 to £50,000+ depending on capacity and complexity. Since April 2022, residential solar installations are VAT-exempt at 0%, reducing the overall cost.

What certifications should a UK solar installer have?

UK solar installers should hold MCS (Microgeneration Certification Scheme) certification, which is mandatory for customers to access the Smart Export Guarantee. RECC (Renewable Energy Consumer Code) membership and TrustMark registration are also strong indicators of quality and consumer protection.

What is the Smart Export Guarantee (SEG)?

The Smart Export Guarantee (SEG) is a UK government scheme requiring licensed energy suppliers to pay small-scale generators for surplus electricity exported to the grid. Rates typically range from 4–6p per kWh, though some suppliers offer higher fixed rates. Your system must be MCS-certified to qualify.

Is battery storage worth it with solar panels in the UK?

Battery storage can increase solar self-consumption from around 40% to 80% or more. With typical battery costs of £2,500–£6,000 and rising electricity prices, most UK homeowners see a return on battery investment within 6–10 years. Batteries also provide backup power during grid outages.

When is the best time to install solar panels in the UK?

Solar panels can be installed year-round in the UK. Spring and autumn tend to have shorter wait times as demand peaks in summer. Installing before April allows you to benefit from a full summer of high solar generation. Panels actually perform slightly better in cooler temperatures, so winter installations are perfectly viable.

Do I need planning permission for solar panels in the UK?

Most domestic solar panel installations in the UK fall under permitted development rights, so planning permission is not required. Exceptions include listed buildings, conservation areas, flats, and systems that protrude more than 200mm from the roof surface. Ground-mounted systems must not exceed 9m² in area. Always check with your local planning authority if you're unsure.

How long do solar panels last in the UK climate?

Modern solar panels are designed to last 25–30 years and come with performance warranties guaranteeing at least 80% output after 25 years. The UK climate - including rain, wind, and temperature variation - does not significantly reduce panel lifespan. Inverters typically last 10–15 years and may need replacing once during the panel lifetime.

Choose which optional technologies SurgePV may use. Essential storage remains active for security and requested features.